U.S. Air Force
Every GovConFeed story on U.S. Air Force — contract awards, policy, enforcement, and protests, newest first.
-
Awards
Air Force to Begin FAMM Cruise Missile Production in September, Eyes 28,000 Units Over Five Years With Anduril and CoAspire
Air Force Chief of Staff Gen. Kenneth Wilsbach confirmed September 2026 production start for the Family of Affordable Mass Missiles, with FY2026 funding already covering the first 1,000 rounds and a five-year plan to procure nearly 28,000 weapons.
-
Awards
SAIC Wins $192M Air Force ABMS Contract to Build CJADC2 Digital Infrastructure Network
SAIC secured a $192 million multiple-award IDIQ to develop digital infrastructure for the Air Force's Advanced Battle Management System, supporting CJADC2 across optical transport, software-defined WAN, cross-domain solutions, and AI-enabled cloud infrastructure from tactical to strategic domains.
-
Awards
Army Posts FRAM II RFP for Apache, Black Hawk, and Chinook Fleet Maintenance at Fort Novosel — Proposals Due July 14
The Army posted the Fort Rucker Aviation Maintenance II solicitation June 9, covering full maintenance of AH-64E Apache, CH-47F Chinook, UH-60M Black Hawk, and UH-72A Lakota fleets at Fort Novosel, Alabama. Proposals are due July 14. Incumbent M1 Support Services is bridging under a $601M modification.
-
Awards
Air Force Awards $4 Billion Base Operations IDIQ to 19 Companies at AETC Training Bases
The Air Force awarded a $4 billion, 10-year base operations IDIQ to 19 companies at 11 AETC training bases on June 8, 2026. The vehicle, managed by the 338th Enterprise Sourcing Squadron at JBSA-Randolph, covers 22 service categories and runs through June 2036.
-
Awards
Air Force Awards Kongsberg $241M Sole-Source Contract for Joint Strike Missile Lot 2 Production
The Air Force awarded Kongsberg Defence & Aerospace a $240.9M firm-fixed-price sole-source contract on June 5, 2026, for Lot 2 production of the Joint Strike Missile — covering all-up rounds, containers, test hardware, and support items for the F-35A through November 2028.
-
Awards
Air Force Awards GE Aerospace, Rolls-Royce OTA Contracts for Medium Thrust Class Drone Engine Designs
The U.S. Air Force awarded OTA contracts to GE Aerospace and Rolls-Royce to develop engines for the Medium Thrust Class Autonomous Collaborative Platform, placing AI-piloted drone propulsion in preliminary design review under Propulsion Consortium Initiative 2.0.
-
Awards
Boeing Wins $200M AFRL IDIQ for Aerospace Vehicle Technology R&D
Boeing won a competitively awarded $200M indefinite-delivery/indefinite-quantity contract from the Air Force Research Laboratory for multidisciplinary aerospace vehicle technology research, integration and transition, with work in St. Louis through May 2037.
-
Awards
General Dynamics Mission Systems Wins $106M MUOS Ground-Segment Sustainment Task Order, $294.9M With Options
General Dynamics Mission Systems received a $106 million task order for baseline sustainment and obsolescence support of the MUOS ground segment, with a total value of $294.9 million if all options are exercised, running through May 2031.
-
Awards
KTH Services JV Wins $221.5M Army Contract for Fort Carson Base Operations Support Through 2031
KTH Services JV LLC of Falls Church, Virginia, won a $221,500,000 firm-fixed-price Army contract for base operations support at Fort Carson, Colorado, through May 2031. The competitively solicited award drew five bids and marks the joint venture's second major BASOPS win.
-
Awards
SpaceX Wins $4.16 Billion Space Force Award to Build Space-Based Airborne Moving Target Indicator Constellation
The U.S. Space Force awarded SpaceX $4.16 billion under an Other Transaction Authority agreement to build a Starshield-based satellite constellation that detects and tracks airborne moving targets, with an initial operational capability targeted for 2028.
-
Awards
Lockheed Martin Wins $100.5M Order for 1,459 F-35 Brake Heat Sinks to Resolve Fleet Thermal Constraint
Lockheed Martin Aeronautics received a $100,455,916 firm-fixed-price order (N0001926F0266) from Naval Air Systems Command for 1,459 F-35 brake assembly heat sinks -- 1,075 for the F-35A and 384 for the F-35B -- to resolve a thermal management constraint. Work is in South Bend, Indiana, through March 2030.
-
Awards
DIU Triples Hermeus Contract to $219M as Quarterhorse Mach-3 Drone Shifts From Test Vehicle to Weapon System
The Defense Innovation Unit added $159 million to its Hermeus Quarterhorse contract, bringing the ceiling to $219 million, as the Mach-3 drone program officially pivots from a test asset to a weapon platform ahead of Mk 2.2 flight tests in 2026.