Evergreen explainers on how federal contracting actually works — certifications, contract types, protests, and compliance.

69articles
2026-09-16latest coverage
Small Business Administrationmost covered
  • Guides

    How the Debriefing Clock Triggers a GAO Stay

    FAR 33.104's automatic stay of contract performance turns on two filing clocks tied to postaward debriefings under FAR 15.505 and 15.506 — miss both windows and GAO cannot freeze a contract award while a protest is pending.

    ·By Marcus Webb
  • Guides

    Getting Started in GovCon: A Practical Guide for Small Businesses

    Federal contracting looks impenetrable from the outside, but the actual on-ramp is a short, well-documented list of steps. Here's what a small business needs first, in order, with the real government links.

    ·By Marcus Webb
  • Guides

    E-Verify for Federal Contractors: The $150,000 Trigger

    FAR 52.222-54 requires contractors awarded federal contracts over $150,000 to enroll in E-Verify within 30 days of award and initiate employee verification within set deadlines, with exceptions for COTS items, short-term and overseas work, and a separate $3,500 flow-down trigger for subcontracts.

    ·By Marcus Webb
  • Guides

    FAR 15.306: Clarifications vs. Discussions Explained

    FAR 15.306 splits post-proposal exchanges into clarifications, communications, and discussions -- only one lets contractors revise their proposal, and missing the difference can mean elimination from the competitive range with no path back.

    ·By Sara Draper
  • Guides

    CMMC Phase 2 Deadline: What Contractors Must Do

    CMMC Phase 2 begins November 10, 2026, requiring C3PAO third-party certification instead of self-assessment for many Level 2 contracts. This guide breaks down the two-rule timeline, how long Conditional and Final CMMC statuses stay current, and subcontractor flow-down requirements.

    ·By Marcus Webb
  • Guides

    REA or Certified Claim? The Label Changes What You Get

    FAR 2.101 splits contract cost disputes into informal Requests for Equitable Adjustment and certified claims under the Contract Disputes Act. Only a certified claim triggers interest under FAR 33.208, starts the CDA appeal clock, and creates personal certification liability for contractors.

    ·By Marcus Webb
  • Guides

    How Contractors Assign Federal Payments Without a Novation

    FAR Subpart 32.8 lets contractors assign contract payments (not the contract itself) to a bank for financing. Here's the $1,000 threshold, notice rules, and how it differs from a novation.

    ·By Marcus Webb
  • Guides

    The Commercial Item Determination: One Checkbox, Big Stakes

    A single FAR Part 12 determination decides which clauses, contract type, and cost-accounting rules apply to a federal award — and getting it wrong can mean CAS exposure years into performance.

    ·By Marcus Webb
  • Guides

    CMMC Level 1, 2, 3: What DFARS 252.204-7021 Requires

    DFARS 252.204-7021 sets four CMMC statuses, hard expiration clocks on assessments, and pre-award subcontractor verification duties — here's how contractors track compliance before certification lapses.

    ·By Sara Draper
  • Guides

    Debriefing Rights and the CICA Automatic Stay Clock

    A missed 3-day debriefing request or a misjudged delayed-debriefing date can cost a contractor the automatic stay that freezes award performance during a bid protest — here is how FAR 15.506 and FAR 33.104 actually run the clock.

    ·By Marcus Webb
  • Guides

    What FAR 52.203-13 Forces Contractors to Report

    FAR 52.203-13's mandatory disclosure rule requires written notice to the agency IG of credible fraud or False Claims Act evidence, and FAR 9.406-2 makes silence its own debarment cause for three years past final payment.

    ·By Sara Draper