U.S. Air Force
Every GovConFeed story on U.S. Air Force — contract awards, policy, enforcement, and protests, newest first.
-
Awards
Air Force Opens Dedicated EPAWSS Speedline at Warner Robins to Accelerate F-15E Electronic Warfare Upgrades Outside Normal Depot Cycle
The Air Force Life Cycle Management Center launched an EPAWSS Speedline at Warner Robins Air Logistics Complex on May 26, 2026, enabling 99 F-15E Strike Eagles to receive the AN/ALQ-250 electronic warfare suite years ahead of their scheduled depot maintenance.
-
Awards
Data Monitor Systems Wins $26.4M DLA Energy Contract to Operate Fuel Services at Naval Air Station Key West
DLA Energy awarded Midwest City, Oklahoma-based Data Monitor Systems a $26.4 million contract to operate government-owned aircraft and ground fuel services at Naval Air Station Key West, covering fuel receipt, storage, distribution, and accounting for aviation fuels supporting SOUTHCOM and Atlantic Fleet operations.
-
Awards
CCI Group Wins $25.4M Contract to Build F-35 Mission Rehearsal Trainer Facility at Luke Air Force Base
The Air Force's 56th Contracting Squadron at Luke Air Force Base awarded CCI Group a $25.4 million construction contract to renovate Building 617 for F-35A Modified Mission Rehearsal Trainers, expanding simulation capacity at the world's largest F-35A training wing.
-
Awards
Parsons Wins $28.8M AFRL Task Order for Research, Development, and Engineering Support at Rome Information Directorate
The Air Force Research Laboratory's Information Directorate in Rome, New York awarded Parsons Government Services a $28.8 million task order for field site support spanning research, development, engineering, and maintenance operations at a facility that develops command-and-control, ISR, and cyber technologies.
-
Awards
Northrop Grumman Wins $49M Air Force Contract for Joint Threat Emitter Software Support
The Air Force Life Cycle Management Center at Hill Air Force Base awarded Northrop Grumman a $49 million cost-plus-fixed-fee contract on May 20 for software support for the Joint Threat Emitter program, which simulates adversary radar and missile threats to train pilots and electronic warfare crews.
-
Awards
Reinhart Foodservice Wins $75M Sole-Source DLA Troop Support Food Contract
Defense Logistics Agency Troop Support awarded Reinhart Foodservice a $75.1 million sole-source IDIQ for full-line food and beverage supply to all four military branches, citing only one responsible source available under FAR 6.302-1, with the contract running 273 days through February 2027.
-
Awards
Stephenson Stellar Wins $98M Sole-Source Engineering Support IDIQ for Air Force Global Strike Command
The Air Force awarded Shreveport-based Stephenson Stellar a $98 million sole-source engineering support IDIQ at Barksdale Air Force Base to address areas of high interest affecting the national security posture of Air Force Global Strike Command, covering the nuclear bomber and ICBM missions through May 2031.
-
Awards
IAP World Services Wins $92M to Replace Deteriorating Radomes on North Warning System Radar Network
The Air Force Life Cycle Management Center awarded IAP World Services two contracts totaling $92 million to replace structurally deteriorating radomes on the AN/FPS-117 long-range and AN/FPS-124 gap-filler radars that guard North American airspace against polar approaches, with work spanning sites in Alaska, Canada, Hawaii, Utah, and Florida.
-
Awards
Geost Wins $89.5M Space Systems Command Modification for Oculus Host Satellite Program
Space Systems Command awarded Geost LLC an $89.5 million contract modification for the Oculus Host program — a classified or restricted satellite program supporting national security space operations.
-
Awards
World Wide Technology Lands $40M AI-Powered SOC Contract With Air Combat Command
World Wide Technology secured a $40 million contract to deliver an AI-enhanced Security Operations Center for Air Combat Command, integrating machine learning threat detection with existing Air Force cyber infrastructure.
-
Awards
Lockheed Martin Wins $879M F-35 Armament Contract for Lots 18 and 19
The Pentagon awarded Lockheed Martin a $879 million modification for F-35 armament integration covering production Lots 18 and 19, continuing the program's decade-long weapons modernization track.
-
Awards
Ansys Government Wins $82M AFTC Contract for Simulation Software at Edwards AFB
The Air Force Test Center awarded Ansys Government Initiatives an $82 million indefinite-delivery/indefinite-quantity contract for software licenses and ancillary engineering services, including modeling and simulation, at Edwards Air Force Base.