U.S. Air Force
Every GovConFeed story on U.S. Air Force — contract awards, policy, enforcement, and protests, newest first.
-
Awards
Army Corps Awards $499M A-E IDIQ to 13 Firms for South Atlantic Military Design Work
USACE Mobile District awards a $499 million multiple-award architect-engineer IDIQ to 13 firms including AECOM, Arcadis-Exp Federal JV, and Burns & McDonnell for military design and construction services across the South Atlantic Division through May 2031.
-
Awards
Lockheed Martin Wins $991M NAVAIR Contract for F-35 Electronic Warfare Modification Kits
NAVAIR awards Lockheed Martin a $991 million firm-fixed-price contract for 432 electronic warfare modification kits across Air Force, Marine Corps, Navy, and foreign military sales variants of the F-35 Joint Strike Fighter.
-
Awards
Amentum Wins $30M Contract to Modernize Return Basin Pump Infrastructure at Arnold AEDC
Amentum Technology secured a $30 million ceiling contract to replace pump assemblies and modernize infrastructure for the Return Basin at Arnold Air Force Base, Tennessee, home of the Arnold Engineering Development Complex.
-
Awards
Moog Military Aircraft Wins $25.9M Long-Term Navy Contract to Repair V-22 Osprey Bladefold Actuators
Moog Military Aircraft secured a $25.9 million long-term Navy contract to repair bladefold actuator components and power modules for the V-22 Osprey fleet, with work performed at its Torrance, California facility through May 2029.
-
Awards
Conti Federal Wins $36.3M Contract to Build B-21 Raider Flight Simulator Facility at Ellsworth AFB
Conti Federal Services won a $36.3 million design-bid-build contract to construct the B-21 Raider ADD Flight Simulator Phase 2 facility at Ellsworth Air Force Base, South Dakota, with completion scheduled for July 2028.
-
Awards
Air Force Awards $866M NASIC Advisory Services IDIQ to Apogee, KBR Wyle, Riverside Research, and SPA
The Air Force awarded an $866 million multiple-award IDIQ for advisory and assistance services at the National Air and Space Intelligence Center to Apogee Engineering, KBR Wyle Services, Riverside Research Institute, and Systems Planning and Analysis.
-
Awards
Alaska Native Firm Goldbelt Apex Wins $73.6M Air Force Contract to Maintain War Reserve Materiel Stocks
The 773rd Enterprise Sourcing Squadron at Joint Base San Antonio awarded Goldbelt Apex LLC a $73.6 million firm-fixed-price contract to maintain Air Force War Reserve Materiel at CONUS sites through January 2029 — a logistics sustainment award that highlights the ANC contracting model in Air Force supply chain programs.
-
Awards
USfalcon Wins $84M Task Order for Air Force Nuclear Weapons Center Advisory Services at Offutt
The Air Force Nuclear Weapons Center awarded USfalcon Inc. an $84.3 million cost-plus-fixed-fee task order on May 4 for advisory services supporting nuclear weapons acquisition programs at Offutt Air Force Base — a high-value cleared services award reflecting the pace of Air Force nuclear modernization.
-
Awards
Northrop Grumman Wins $100M Sole-Source Air Force Contract for Stand-in Attack Weapon Seeker Components
Northrop Grumman secured a sole-source Air Force contract worth up to $100M for active seeker components, test and evaluation support, and science and technology development for the Stand-in Attack Weapon (SiAW) — an F-35A-compatible air-to-surface missile targeting enemy air defenses — with performance through December 2034.
-
Awards
Applied Research Associates Wins $111.5M Naval Research Laboratory High-Performance Computing IDIQ
Applied Research Associates landed a $111.5M IDIQ from the Naval Research Laboratory on May 8 for high-performance computing R&D support, including cryptographic capability development and network protocol design at the NRL's Washington, D.C. facility.
-
Awards
Planned Systems International Wins $110M AFSOC Mission Integration Contract at Hurlburt Field
The Air Force awarded Planned Systems International a $110M hybrid contract to sustain and modernize Air Force Special Operations Command's integrated mission systems, covering global maintenance, cybersecurity, and deployed support.
-
Awards
Boeing Gets $125M More for Air Force One Spare Parts as New VC-25B Nears 2028 Delivery
The Air Force Life Cycle Management Center added $125M to Boeing's VC-25B contract for initial long-lead spare parts, pushing the Air Force One replacement program past $4.4B as a bridge test aircraft completed ground testing in May.