The Army has added more money to the contract that keeps its helicopter units flying. Amentum Services Inc. of Chantilly, Virginia, will keep maintaining rotary-wing aircraft for Combat Aviation Brigades at home and abroad through Nov. 30, 2027, after a new modification raised the contract's face value to $469.6 million. The $34,407,938 action, modification P00120 to contract W58RGZ-25-C-0003, was listed in the Nov. 25, 2026 Department of War contract announcement, as mirrored by GlobalSecurity. Germany, Honduras, Kuwait and Saudi Arabia paid for about a quarter of the new money through Foreign Military Sales.

The announcement states that "the modification brings the total cumulative face value of the contract to $469,578,660." The Army obligated the full amount at award, which means this is funded work and not just more room under a ceiling.

What the Combat Aviation Brigade Maintenance Contract Covers

W58RGZ-25-C-0003 is the Army's global aviation maintenance services contract. The government description posted on HigherGov sets out its purpose: "Provide global aviation maintenance services for United States Army Aviation and Missile Command Field Maintenance Directorate."

According to that description, the work includes field and sustainment-level maintenance for Army rotary-wing aircraft across all Army Mission Design Series, installing aircraft modifications, and resetting aircraft to a mission-capable condition. The contract supports Combat Aviation Brigades, separate battalions, detachments, and National Guard and Reserve aviation units. The tasks include passback maintenance, applying Maintenance Work Order and other level-of-effort work, at sites in the continental United States and overseas.

Under the Nov. 25 modification, work will take place in Germany, Saudi Arabia, Honduras and Kuwait, and at U.S. sites that include Aberdeen Proving Ground, Maryland; Fort Campbell, Kentucky; Savannah, Georgia; Fort Belvoir, Virginia; Redstone Arsenal, Alabama; Groton, Connecticut; and Kingston, Rhode Island. The DoD notice gives an estimated completion date of Nov. 30, 2027.

Where the $34.4 Million Comes From

The modification draws on four funding lines, all obligated at award:

  • Fiscal 2027 Army operations and maintenance: $24,895,713
  • Foreign Military Sales (Germany, Honduras, Kuwait, Saudi Arabia): $8,402,459
  • Army research, development, test and evaluation: $709,597
  • Aircraft procurement, Army: $400,170

Operations and maintenance money pays for most of the action, which fits a sustainment contract built around keeping existing fleets ready. The $8.4 million in Foreign Military Sales funding is the more telling line. It shows that four partner governments are paying for work under the same contract the Army uses for its own brigades. That gives the program a customer base outside the Army's own budget.

The smaller procurement and RDT&E lines suggest the modification covers some modification and test-related work along with routine maintenance. That is consistent with the contract's description, which includes installing aircraft modifications. The announcement names "Army Contracting Command, Redstone Arsenal, Alabama," as "the contracting activity."

Advertisement

How the Face Value Climbed Past HigherGov's Recorded Ceiling

HigherGov's procurement records show the contract was awarded in December 2024 under the AFM II solicitation for rotary-wing field and sustainment maintenance. The award was made through full and open competition under NAICS 488190 and PSC J015, and HigherGov records five bids. The listing gives a Dec. 1, 2024 start date, a current end date of Nov. 30, 2026, and a potential end date of May 31, 2028.

The contract has grown through a long series of modifications. The first DoD announcement HigherGov ties to the contract, from November 2024, was a $27,097,787 modification, P00001. The newest action is numbered P00120. HigherGov's analysis notes that "the Potential Award value has increased 17% from $342,058,981 to $400,943,392." The Army's announced face value of $469,578,660 is now well above that recorded potential value. HigherGov's own announcement feed shows the face value rising from $416,844,290 (P00118) to $435,170,338 (P00119) and then to $469,578,660 (P00120) within the same month, so the procurement record likely trails the daily announcements. Contractors tracking the program should treat the DoD figure as current.

The timing also matters. HigherGov's current end date of Nov. 30, 2026 falls just days after the Nov. 25 announcement, and the modification sets a new estimated completion date of Nov. 30, 2027. In effect, the action carries Amentum's work through another year of performance.

Advertisement

A Second Amentum Award on the Same Day

The Army modification was one of two Amentum awards announced that day. Pulse 2.0 reports that Amentum Technology received a $68.28 million task order for communications support to the U.S. Space Force's 21st Communication Squadron at Cheyenne Mountain Space Force Station and Peterson Space Force Base in Colorado, for a combined announced value of $102.68 million. Pulse 2.0 adds: "Across the two actions, the government obligated approximately $46.35 million at award."

ByteWire News, which rounded up the day's defense awards, also lists the $34.4 million modification and the $469.6 million cumulative face value.

What It Means for Contractors

Field maintenance subcontracting stays active through 2027. HigherGov's invoice data lists Millenium Systems, Alog, M&E Global and Championship Enterprises as subcontractors that have worked on the contract, and it notes an individual subcontracting plan. Firms that supply maintainers, parts logistics or Maintenance Work Order support at Fort Campbell, Redstone Arsenal or overseas sites may find another year of funded work to pursue under Amentum.

Watch the FMS lines. Germany, Honduras, Kuwait and Saudi Arabia together put $8.4 million into this one action. Partner-funded work can carry country-specific site requirements, security vetting and staffing rules, so teams that already work in those countries may be better placed when the Army seeks follow-on support.

Plan for the AFM recompete. HigherGov lists a potential end date of May 31, 2028, and the contract has already passed its recorded ceiling through repeated modifications. Both suggest a follow-on competition could come within the next two years, though no source announces one. The original award drew five bids under full and open competition. Firms that want to compete for the Army's rotary-wing field maintenance work should track the Army Aviation and Missile Command Field Maintenance Directorate and the Redstone contracting office for sources-sought notices and industry days on SAM.gov.

Use DoD announcements, not lagging databases, for sizing. The gap between the $469.6 million announced value and the roughly $400.9 million potential value in procurement records shows how fast this program moves. Capture teams building pipeline estimates should check the daily contract announcements, not only aggregated award data.

Sources