The Army has picked the backpack-sized spectrum sensor it wants in soldiers' hands for the next five years, and the winner is a 350-person small business rather than a prime. Research Innovations Inc. of Alexandria, Virginia, will supply, deliver and sustain its Dragonfly electromagnetic spectrum sensor under a $99,529,577 firm-fixed-price indefinite-delivery/indefinite-quantity contract that the Department of War listed in its Sept. 3 contract digest. Army Contracting Command at Aberdeen Proving Ground, Maryland, runs the contract, W56KGY-26-D-A002, with an estimated completion date of Sept. 2, 2031.

The competition drew 95 bids. That number stands out for a contract with a ceiling under $100 million, and it says as much about the tactical spectrum-sensing market as it does about the product that won.

What the $99.5M Dragonfly IDIQ Buys

The digest language is spare. RII "was awarded a $99,529,577 firm-fixed-price indefinite-delivery/indefinite-quantity contract for procurement, delivery and sustainment of Dragonfly systems," the entry states, adding that "Bids were solicited via the internet with 95 received." Work locations and funding will be set with each order, which is standard for an IDIQ and means the ceiling is a cap, not a commitment.

The product behind that line is more specific. RII describes Dragonfly on its product page as "a sensor and a ruggedized, AI-driven fusion platform that packs workstation-class supercomputing into 3.5 lbs." The company bills it as the industry's first GPU-accelerated spectrum cognition node, and the hardware list backs the claim: an Intel Xeon W eight-core CPU, an NVIDIA RTX A4500 GPU with 384 tensor cores, roughly 7 TB of solid-state storage and a containerized Docker software architecture, all in a unit one soldier can carry. It runs with zero cloud reachback and, according to the company's June GSA announcement, in GPS-degraded environments.

Functionally, Dragonfly classifies signals automatically, performs search and survey with what RII calls 1000x zoom, and does direction finding and geolocation, with networked units triangulating an emitter between them. One feature RII highlights is retroactive direction finding: a rolling log of spectrum data lets operators track the origin of a signal that went dark up to an hour earlier. The system also handles swarm networking, emissions-control monitoring for friendly forces and adversary drone detection. RII lists man-portable, vehicle-mounted, tethered or free-flying UAS, and unmanned surface vessel configurations.

Why 95 Bids Changes the Story

Washington Technology's Nick Wakeman reported the award on Aug. 31, writing that "The Army has awarded a nearly $100 million contract to Research Innovations Inc. for ruggedized sensors that autonomously process electromagnetic spectrum." Wakeman, citing the Defense Department's contract digest, noted the 95 bids and the five-year term. ClearanceJobs reprinted the digest language on Sept. 4.

Ninety-five bids for a five-year, $99.5 million ceiling signals how crowded the tactical spectrum-sensing market has become. Small drones, software-defined radios and cheap GPU compute have lowered the cost of building a sensor that once required an EW prime's engineering bench, and the bid count suggests dozens of firms now believe they can compete for Army spectrum work. Dragonfly came through an open internet solicitation, and the asterisk on the digest entry marks RII as a small-business awardee. The digest does not say whether the solicitation was set aside, so it is not clear from the public record whether RII beat other small firms or a mixed field that included larger EW houses.

Advertisement

From xTechPacific to the GSA Schedule to Aberdeen

RII's path to the award follows a route the Army has been building deliberately for small firms. On Sept. 1, 2025, the company announced it had won the Army's xTechPacific competition with Dragonfly, which it described then as "a low-profile, electronic warfare and signals intelligence edge compute tool in an exceptionally small form factor." The release referenced Army coverage of the system with the 25th Infantry Division.

The following June, RII put Dragonfly on the GSA Multiple Award Schedule under contract GS-35F-284DA, SIN 33411, in two configurations: Dragonfly Tactical DF System and Dragonfly Spectrum Dominance. That release said the system was already in use with Army units and had been mission-rehearsed on Navy unmanned surface vessels. Brian Shirey, RII's vice president of EW/SIGINT, said at the time: "Our focus with Dragonfly has always been to put expert-level capability in the hands of operators at the tactical edge."

The GSA listing gave any federal buyer a fast lane to order units. The Aberdeen IDIQ goes further, turning Dragonfly from a schedule item into a formal Army procurement with sustainment attached. Founded in 2009, RII has grown to about 350 employees with headquarters in Alexandria, according to Washington Technology.

What It Means for Contractors

The award offers three lessons for firms working the spectrum and EW space.

First, the prize competitions are converting. xTech wins are easy to dismiss as marketing, but RII's sequence, from xTechPacific in September 2025 to a GSA schedule listing in June to a production IDIQ in September, shows the pipeline producing a real contract within a year. Companies that treat xTech as a path to Aberdeen rather than a plaque should plan for the follow-on paperwork early.

Second, the small-business lane in spectrum sensing is open and crowded. Ninety-five bids mean 94 companies walked away. Those firms should expect task orders under this IDIQ to go to RII, but a single $99.5 million vehicle is unlikely to exhaust the Army's appetite for man-portable and drone-mounted spectrum sensors, and the losing bidders now have a clear picture of the form factor and feature set the service chose.

Third, platform-agnostic design mattered. Dragonfly's pitch is that the same 3.5-pound box rides in a rucksack, on a vehicle, under a drone or on a USV. With the Navy already rehearsing the system on unmanned surface vessels, a five-year Army IDIQ with work locations determined per order gives RII a vehicle other services can point to. Contractors building single-platform sensors are competing against a product that has already demonstrated cross-domain use.

Task orders will define the real dollar value. The ceiling is $99.5 million; funding, per the digest, is set per order. Watch for the first Dragonfly delivery orders to learn how many units the initial buys cover and which formations receive them.

Sources