The Pentagon has formally validated CACI International's SkyValor counter-unmanned aerial systems platform for use across the entire Joint Force, clearing the autonomous, mobile system for operational deployment wherever warfighters face drone threats. According to DefenseScoop, the department determined that SkyValor — formerly called Merlin — is suited for use as one component of a layered counter-UAS defense to meet operational needs anywhere warfighters need to defend themselves from drones. That language is significant because it is not theater-specific or mission-constrained: the Pentagon's endorsement applies across the entire Joint Force, a designation that meaningfully broadens the system's potential addressable market well beyond the southern-border test environment in which it was evaluated.

The validation followed a two-day operational evaluation conducted in mid-May 2026 at Marine Corps Air Station Yuma, Arizona. The assessment was led by Joint Interagency Task Force 401, known as JIATF-401, in coordination with Joint Task Force-Southern Border and U.S. Customs and Border Protection. The multi-agency character of the evaluation was deliberate: JIATF-401 was stood up specifically to integrate military, law enforcement, and border security capabilities along the approximately 2,000-mile southern border, making it a demanding real-world proving ground for a system intended for joint operational use. Yuma's expansive air space and existing range infrastructure made it a practical venue for assessing long-range detection and defeat performance under conditions that approximated actual border operations.

CBP liaison Jose Gonzalez confirmed that the evaluation incorporated direct feedback from both military personnel and border agents, giving the test criteria an operational grounding that purely laboratory or range assessments often lack. Lt. Col. Alejandro Elizalde, JIATF-401's southern border team lead, emphasized the importance of interagency collaboration in achieving a validation result that would carry weight across multiple component commands and mission sets. That cross-agency buy-in matters for contractors pursuing follow-on work: Pentagon and DHS procurement offices rarely accelerate fielding for systems that have not already demonstrated interoperability and stakeholder alignment across at least two mission owners with distinct operational authorities.

What SkyValor Demonstrated at Yuma

During the MCAS Yuma evaluation, SkyValor demonstrated long-range detection, tracking, identification, and defeat capabilities against multiple drone flight profiles at extended ranges. The system handled the full threat spectrum the border environment presents — from small commercial first-person-view quadcopters, the kind increasingly used by cartel surveillance and smuggling operations, up to the largest military-grade platforms. That breadth of coverage across drone size classes addresses a persistent gap in counter-UAS procurement: many fielded systems are optimized for either the small-UAS threat or the larger military platform threat, but not both simultaneously. Demonstrating performance across that full range in a single evaluation is an outcome that broadens SkyValor's relevance to program offices managing layered defense requirements.

Advertisement

SkyValor relies exclusively on non-kinetic defeat options, which keeps it compliant with rules of engagement in domestic and border-adjacent environments where kinetic fires would be legally and politically constrained. Specifically, the system incorporates radio frequency jammers capable of severing drone command links at extended ranges, and net capture systems with an effective engagement envelope of nearly four miles. The platform operates autonomously around the clock without requiring continuous operator intervention, mounted on a mobile trailer that can be repositioned as threat corridors shift — a logistical advantage that reduces the manpower burden on already-stretched border security units operating across vast stretches of difficult terrain.

The system also functions at multiple classification levels, meaning it can ingest and share data across both classified and unclassified network segments. For a joint-force deployment spanning National Guard, active-duty, and federal law enforcement elements operating under different network authorities, that multi-classification capability is often a non-negotiable prerequisite for interoperability that program offices evaluate before approving a system for joint use. SkyValor's ability to operate across that spectrum without requiring network changes on the receiving end reduces integration friction at the unit level.

What It Means for Contractors

Pentagon validation for joint-force use is a meaningful milestone for prime contractors competing in the counter-UAS market, and for the subcontractors and integrators that support them. The designation signals that SkyValor has cleared the operational testing threshold the department requires before multi-command procurement can proceed at scale. Contractors that provide RF sensing components, trailer-mounted power and ruggedization systems, autonomous software stacks, or network integration services should treat this validation as a forward indicator for the fiscal year 2027 budget cycle, when counter-UAS line items are widely expected to grow.

CACI did not disclose a specific contract value or procurement pathway in connection with the validation announcement, and Pentagon public affairs deferred questions about follow-on contracting. That silence is not unusual at this stage — systems that receive joint-force validation frequently move into restricted acquisition planning before public contract awards appear in USASpending or on SAM.gov. Contractors interested in teaming with CACI on SkyValor integration work, or competing on derivative counter-UAS task orders that reference this validation, should monitor JIATF-401 solicitations and the broader Department of Homeland Security counter-UAS procurement vehicles for near-term requirements activity.

The southern border is increasingly a proving ground that carries acquisition weight inside the Pentagon. Programs that survive the interagency rigor of a JIATF-401 evaluation — with CBP, military, and law enforcement stakeholders all co-authoring the test criteria — tend to receive faster procurement action than systems validated only in controlled range settings. SkyValor's trajectory from the former Merlin designation to a validated joint-force platform also demonstrates how a rebranded, iteratively developed system can reach the procurement finish line when paired with a credible operational test structure and documented multi-agency endorsement. Program managers and business development teams pursuing dual-market approvals covering both military and border security customers should note that the JIATF-401 evaluation framework appears replicable for other systems in the C-UAS pipeline. As the drone threat continues to evolve across both foreign battlefields and domestic airspace, joint-validated platforms like SkyValor are likely to draw sustained interest from program offices seeking solutions that can scale from small-unit tactical use to theater-wide layered defense architectures.

Sources