Huawei now stands convicted in a U.S. court of fraud, sanctions violations and trade-secret theft, a result that adds weight to arguments for keeping the Chinese telecom giant's gear out of American networks and federal supply chains. A Brooklyn federal jury on Tuesday, Nov. 24, found Huawei Technologies Co., Ltd. and three subsidiaries guilty on charges tied to its Iran business and to thefts from U.S. companies, the Justice Department announced. The jury also handed the company a partial win: it acquitted Huawei of racketeering conspiracy, the most serious charge it faced, according to Al Jazeera.

The three subsidiaries convicted alongside the parent are Chinese affiliate Huawei Device Co. Ltd. and U.S. units Futurewei Technologies Inc. and Huawei Device USA Inc. Sentencing is set for Sept. 14, 2027, before U.S. District Judge Ann Donnelly in the Eastern District of New York, according to CNN.

Which Huawei Counts Stuck, and Which Two Failed?

DOJ lists the convictions as conspiracy to steal trade secrets, conspiracy to commit wire and bank fraud, wire fraud, bank fraud, conspiracy to defraud the United States, conspiracy to violate the International Emergency Economic Powers Act (IEEPA), substantive IEEPA violations, and money laundering conspiracy.

The department's release does not mention the counts the government lost. CNN, carrying a Reuters report, says the jury found Huawei guilty on 10 of the 12 counts it faced and acquitted it of conspiring to obstruct justice and of racketeering conspiracy, "a charge alleging the company had acted as a criminal enterprise." Al Jazeera notes that the racketeering charge is typically used in organized crime and drug cases; prosecutors used it here to accuse Huawei of operating in an illicit fashion to steal intellectual property from U.S. companies.

The trial ran more than two months, with prosecutors calling more than 60 witnesses and the defense calling 15, according to CNN. DOJ describes it as a three-month trial.

Attorney General Todd Blanche opened the department's statement bluntly: "No person or company is above the law." Assistant Attorney General Tysen A. Duva of the Criminal Division added: "Today’s verdict sends an unmistakable message: America will defend its businesses, protect its workers, and safeguard its national security against corrupt foreign corporations that lie, cheat, and steal to get ahead."

How Skycom Kept Huawei Inside the Dollar System

The sanctions and bank fraud counts center on Iran. According to DOJ, Huawei and its subsidiaries provided turnkey services for an internet backbone and broader mobile network access in Iran, and helped the regime and Zaeim, a component of the Iranian intelligence apparatus, monitor and censor users' internet access. DOJ says testimony "further established that Huawei provided surveillance cameras that enabled the Iranian regime to monitor protest activity."

Advertisement

Huawei ran that business under the name "Skycom." DOJ says Huawei falsely told banks, journalists and the U.S. government that it did not assist Iran's government, military or intelligence community, that it had begun restricting its Iran business in 2011, and that Skycom was a business partner rather than a wholly-owned subsidiary. Huawei lied to banks, DOJ says, to obtain billions of U.S. dollars and access to U.S.-dollar clearing services.

The banking thread runs back to 2018. The original indictment alleged that Huawei misled HSBC, Standard Chartered and BNP Paribas about its Iran dealings, and the case emerged publicly when Canada detained Huawei CFO Meng Wanzhou on a U.S. warrant that December. Meng later entered a deferred prosecution agreement and the charges against her were dropped. She did not testify, but jurors saw a statement attached to her agreement in which she acknowledged the company illegally did business in Iran, Al Jazeera reports. "After the media started questioning Huawei’s operations in Iran, so did Huawei’s banks," prosecutor Meredith Arfa told jurors in closing arguments, according to CNN.

From T-Mobile's Tappy to Cisco's 'Crown Jewel' Code

Prosecutors added the trade-secret charges in 2020. DOJ's account of the trial evidence reads like a catalog of industrial espionage against U.S. firms:

Advertisement
  • T-Mobile: Huawei signed a nondisclosure agreement to study Tappy, a robot T-Mobile used to test touchscreen responsiveness, while intending to violate it. When photographs and technical details were not enough, an employee carried a piece of the robot out of T-Mobile's lab in his backpack.
  • Cisco: Huawei copied router source code DOJ calls the "crown jewel" of Cisco technology. Engineers left Cisco's own notes in place and referred to the company as "ocsic."
  • Fujitsu: A Huawei employee caught photographing proprietary Fujitsu equipment wore a badge identifying him as an employee of "Weihua."
  • CNEX: After CNEX declined to work with Huawei directly, Huawei hired a university researcher to arrange a collaboration without disclosing who he worked for, gaining direct access to CNEX's proprietary hardware.
  • Quintel: Huawei obtained confidential information from the U.S. antenna maker under an NDA, then filed a patent application that attached a confidential Quintel slide.

Why Huawei Calls the Racketeering Acquittal a Win

Huawei's defense argued that investigators had built a grand-conspiracy story out of isolated misconduct by a few of its more than 200,000 employees, and that the banks knew about its Iran business. Huawei lawyer Brian Heberlig said the company would appeal but treated the racketeering acquittal as vindication. "That was the only count that brought all of the allegations together," he said outside court, according to Al Jazeera, adding that the verdict "repudiated the central government narrative in the case." CNN reports he said the acquittal vindicated Huawei's "good-faith compliance culture."

Asked about penalties, Heberlig said it was premature to comment but that the racketeering acquittal could make a significant difference. DOJ says the defendants face criminal fines, forfeiture and restitution; no dollar figure has been set.

What It Means for Contractors

The verdict does not create new procurement rules. Huawei equipment and services are already off-limits in federal contracting under Section 889 of the FY2019 National Defense Authorization Act, implemented through FAR 52.204-25, and Al Jazeera reports the company has not been allowed to sell equipment to U.S. carriers for years. The connection below is GovConFeed analysis; neither DOJ nor the news reports tie the verdict to procurement policy.

A criminal conviction on 10 counts, including sanctions and trade-secret charges, arguably makes it harder to argue for any future loosening of those exclusions and gives agencies a court record to point to when they scrutinize supply chains. Contractors should treat the following as live exposure:

  • Section 889 representations: Re-check FAR 52.204-24 and 52.204-26 representations and the "reasonable inquiry" behind them, particularly for subcontracted telecom, networking and video surveillance gear.
  • Affiliates and white-label products: The Fujitsu "Weihua" badge episode is a reminder that names and branding can obscure origin. Verify the manufacturer behind rebranded equipment.
  • Trade-secret hygiene: The T-Mobile and Quintel episodes both began with NDAs. Firms sharing technical data with foreign partners should limit what crosses under those agreements and control physical lab access.

Sentencing in September 2027 will determine the penalties. Huawei says it expects to appeal.

Sources