The Navy has put a 28-company contract vehicle in place for the Surface Electronic Warfare Improvement Program (SEWIP) Family of Systems. Prime contractors, mid-tier integrators and a group of small businesses can now compete for work on the AN/SLQ-32(V) shipboard electronic warfare systems installed on Navy, Coast Guard and allied ships. The Pentagon's Nov. 19, 2026 contract announcement lists the 28 awardees, which share a combined $7,125,820,000 indefinite-delivery/indefinite-quantity (IDIQ) multiple-award contract. If the Navy exercises every option, work on the vehicle runs through November 2036.

The award mixes several pricing structures. According to the announcement, the contract is a "firm-fixed-price, fixed-price incentive (firm-target), cost-only, cost-plus-fixed-fee, and cost-plus incentive-fee" vehicle, so individual task orders can be priced to fit the work, from fixed-price production runs to cost-reimbursable engineering. Program Acquisition Executive Mission Systems in Washington, D.C., is the contracting activity. The announcement does not list any funding obligated at award.

Which 28 Companies Made the SEWIP Family of Systems Pool?

The awardee list, contracts N6175027D1401 through N6175027D1428, includes most of the large defense electronics and mission-systems firms. Among them are BAE Systems Technology Solutions & Services Inc. of Rockville, Maryland; CACI Inc. Federal and Amentum Services Inc., both of Chantilly, Virginia; CAES Systems LLC of Lansdale, Pennsylvania; General Dynamics Information Technology Inc. of Falls Church, Virginia; General Dynamics Mission Systems Inc. of Manassas, Virginia; HII Mission Technologies Corp. of McLean, Virginia; Leidos Inc. of Reston, Virginia; Lockheed Martin Corp. of Liverpool, New York; Mantech Advanced Systems International Inc. of Herndon, Virginia; Northrop Grumman Systems Corp. of Linthicum Heights, Maryland; and Raytheon Co. of Goleta, California.

The pool also includes smaller and more specialized firms that the announcement does not flag as small businesses: Aeronix Inc. of Melbourne, Florida; EWA Warrior Services LLC of Huntsville, Alabama; Laurel Technologies Partnership of Johnstown, Pennsylvania; Ultra Electronics Ocean Systems Inc. of Braintree, Massachusetts; and VT Milcom Inc. of Virginia Beach, Virginia.

The announcement marks 11 awardees as small businesses: Distributed Spectrum Inc. of New York; Frequency Electronics Inc. of Uniondale, New York; Future Technologies Inc. of Herndon, Virginia; Management Services Group Inc., doing business as Global Technical Systems, of Virginia Beach; Innovative Defense Technologies LLC of Arlington, Virginia; Product Development Associates Inc. of Burnsville, Minnesota; Research and Development Solutions Inc. of McLean, Virginia; Systems Engineering Support Co. Inc. of San Diego; Simventions Inc. of Fredericksburg, Virginia; Systems & Processes Engineering Corp. of Austin, Texas; and PCI Aviation LLC of Atmore, Alabama.

The Navy received 31 offers and made 28 awards. "This contract was competitively solicited via the System for Award Management website (SAM.gov) and the Procurement Integrated Enterprise Environment Solicitation Module, with 31 offers received," the announcement states.

What the AN/SLQ-32 Upgrades Do on Navy Ships

SEWIP is the Navy's program to modernize shipboard electronic warfare. The Navy fields it in blocks rather than as one replacement system. The contract announcement describes the structure directly: "The SEWIP FoS consists of several block upgrades that, when combined, create variants which are installed on surface ships, and perform the mission of early detection, signal analysis, threat warning, and protection from anti-ship missiles on Navy, Coast Guard, and allied ships."

Advertisement

The announcement and the solicitation notices describe a single multiple-award structure covering production, design agent engineering and integration. Future orders will presumably be competed among the 28 holders, as is typical for a multiple-award IDIQ, though the sources do not describe the ordering process.

How Solicitation N00024-26-R-5504 Reached Award

The competition ran under solicitation N00024-26-R-5504. A notice dated Jan. 30, 2026 in the history copied from SAM.gov by SamSearch set out the scope: "NAVSEA is conducting a full and open competitive acquisition, under an Indefinite-Delivery-Indefinite-Quantity (IDIQ) Multiple-Award Contract (MAC), for the procurement of SEWIP AN/SLQ-32(V) Full Rate Production, Design Agent Engineering, and Integration requirements."

Those three work types plausibly explain the pricing mix in the final award: full-rate production fits fixed-price and incentive structures, while design agent engineering and integration fit cost-type orders. That pairing is the author's inference, not a statement from the Navy.

Advertisement

The proposal deadline slipped more than once. A Feb. 26 amendment extended it to March 31, 2026, and a March 26 update extended it again to April 9, 2026. That update "incorporates updated clauses due to the FAR overhaul, updates the Statement of work, and modifies the contract format with administrative changes due to the transition to new contract software," according to the notice history published by Gov Contract Finder. The next day NAVSEA issued a correction: "This update extends the proposal due date to 9 April 2026 as the previous amendment had only extended the date to 8 April 2026." An April 2 update added Amendment 4, which deleted the 52.242-4 Certification of Final Indirect Costs clause from Section I, among other changes. Offerors had to acknowledge every amendment in their proposals. Award came about seven months after the April 9 deadline.

What It Means for Contractors

Holding a seat on a multiple-award IDIQ is a license to compete, not a guarantee of work. The $7.13 billion figure is a combined value shared by all 28 holders, and the announcement attaches no obligated dollars to the basic award. Revenue will depend on winning task orders over the life of the vehicle.

For the large primes, the vehicle offers access to production and integration work under one contract structure. For the 11 small businesses on the list, it offers a direct seat on the vehicle for SEWIP-related work, rather than depending only on subcontracts from a prime. Firms in the pool should be ready for order-level competitions that test past performance on specific blocks, and for pricing discipline across both fixed-price and cost-type work.

Companies that did not make the pool have fewer options. With 31 offers and 28 awards, at most three offers went unawarded, and firms that skipped the competition will likely have to find work through subcontracts or teaming agreements with holders. Suppliers of electronic warfare components should map which holders are likely to pursue production orders and which are positioned for engineering support, because the two kinds of work may go to different teams.

The period of performance also matters. With options running through November 2036, businesses that want a role in surface-fleet electronic warfare work under this program should plan a relationship with at least one of the 28 holders.

Sources