Lockheed Martin
Every GovConFeed story on Lockheed Martin — contract awards, policy, enforcement, and protests, newest first.
-
Awards
Navy Awards $249.9M LIIS-CMDS Logistics IT Modernization IDIQ to 59 Firms
The Navy awarded the $249.9M LIIS-CMDS IDIQ to 59 of 72 offerors across two lots on June 11 to modernize logistics data integration and software capability for fleet readiness through 2031.
-
Awards
Boeing Withdraws From Navy UJTS Jet Trainer Competition, Leaving Textron and SNC in $2.7B T-45 Replacement Race
Boeing withdrew from the Navy's $2.7B UJTS competition in June 2026, citing engine qualification timelines for the T-7A Red Hawk. Textron Aviation Defense and SNC remain as the only two competitors to replace the T-45 Goshawk.
-
Awards
Lockheed Martin Wins $200.8M Navy Contract for AEGIS Training Support Across Six Foreign Military Sales Partners
Lockheed Martin's Orlando-based Rotary and Mission Systems unit won a $200,823,547 Navy contract to provide AEGIS combat-system training support to six Foreign Military Sales partners — Australia, Canada, Japan, Norway, South Korea, and Spain — through June 2031.
-
Awards
Lockheed Martin Wins $100.5M Order for 1,459 F-35 Brake Heat Sinks to Resolve Fleet Thermal Constraint
Lockheed Martin Aeronautics received a $100,455,916 firm-fixed-price order (N0001926F0266) from Naval Air Systems Command for 1,459 F-35 brake assembly heat sinks -- 1,075 for the F-35A and 384 for the F-35B -- to resolve a thermal management constraint. Work is in South Bend, Indiana, through March 2030.
-
Awards
Lockheed Martin Wins $54M NAVAIR Order for MH-60 Seahawk System Configuration 28 Fleet-Wide Release
NAVAIR awarded Lockheed Martin's Rotary and Mission Systems division a $54.1 million order to engineer, test, and deploy System Configuration 28 — the next major avionics and software baseline across the entire MH-60 Seahawk fleet — covering Navy and allied foreign military sales variants through October 2028.
-
Awards
Lockheed Martin Wins $879M F-35 Armament Contract for Lots 18 and 19
The Pentagon awarded Lockheed Martin a $879 million modification for F-35 armament integration covering production Lots 18 and 19, continuing the program's decade-long weapons modernization track.
-
Awards
Lockheed Martin Awarded $61M to Develop PAC-3 MSE Containerized Launcher and RIG-360 System
Army Contracting Command – Redstone Arsenal awards Lockheed Martin a $61 million cost-plus-incentive-fee contract to develop and demonstrate the Missile Segment Enhancement Containerized Launcher and RIG-360 Integrated Assembly, including three flight test articles.
-
Awards
Lockheed Martin Wins $991M NAVAIR Contract for F-35 Electronic Warfare Modification Kits
NAVAIR awards Lockheed Martin a $991 million firm-fixed-price contract for 432 electronic warfare modification kits across Air Force, Marine Corps, Navy, and foreign military sales variants of the F-35 Joint Strike Fighter.
-
Awards
Lockheed Martin Wins $212M Army Modification for PAC-3 Missile Logistics and Repair
The Army awarded Lockheed Martin a $212.7 million contract modification on May 12 for PATRIOT Advanced Capability-3 missile and launcher repair and logistics support, bringing the program's cumulative contract value to $875.6 million as PAC-3 demand surges globally.
-
Awards
Space Force Awards $3.2 Billion to 12 Companies to Prototype Golden Dome Space-Based Interceptors
Space Systems Command awarded 20 Other Transaction Authority contracts worth up to $3.2 billion to 12 companies — including SpaceX, Anduril, Lockheed Martin, and Northrop Grumman — to develop space-based interceptors for the Golden Dome missile defense architecture.
-
Awards
Lockheed Martin RMS Receives $75.6M Modification for Navy and Coast Guard Integrated Combat Systems
Lockheed Martin Rotary and Mission Systems picked up a $75.6M contract modification on May 8 for systems engineering and software integration supporting integrated combat systems across Navy and Coast Guard surface forces, with work split between Moorestown, NJ and Columbia, MD.
-
Awards
Lockheed Martin Wins $407M to Advance Aegis Guam Missile Defense to Combat-Ready Status
The Missile Defense Agency modified Lockheed Martin's Aegis Guam contract by $407M, pushing the total program value past $1.9B as the Pacific deterrent system moves toward engineering certification.