Contractor
SpaceX
Every GovConFeed story on SpaceX — contract awards, policy, enforcement, and protests, newest first.
13articles
2026-11-17latest coverage
Awardsmost-covered category
U.S. Space Forcemost appears with
-
Awards
Space Force FY26 launches: SpaceX gets 5 missions ($714M), ULA gets 2 ($428M)
Second-round FY2026 National Security Space Launch assignments under Phase 3 Lane 2 — SpaceX captures the majority, ULA wins GPS IIIF and a classified NRO payload. FY27-FY32 launch windows.