U.S. Air Force
Every GovConFeed story on U.S. Air Force — contract awards, policy, enforcement, and protests, newest first.
-
Awards
Air Force Buys Balloon Weather Data From WindBorne in $48.7M Sole-Source Deal, $1.7M Committed
The Air Force signed a sole-source, firm-fixed-price IDIQ with WindBorne Systems for balloon-gathered atmospheric profiles through 2033. The ceiling is $48.7M, but only $1.7M is obligated; more orders hinge on data quality and forecast impact.
-
Awards
$2.82B KC-46 Lot 13 Closes Out Boeing's Original Tanker Contract as Price Climbs 14%
The Air Force ordered 15 KC-46A Lot 13 tankers from Boeing for $2.82 billion, the final lot under the 2011 contract and more than 14% above Lot 12. A 75-jet follow-on hinges on Boeing fixing deficiencies.
-
Awards
AFWERX Lifts MVP Robotics Contract Ceiling to $95M With $90.1M Modification
AFWERX raised the ceiling on MVP Robotics' contract FA2280-26-D-0001 from $4.9 million to $95 million through a $90.1 million firm-fixed-price modification. Only $4.335 million in fiscal 2026 RDT&E money was obligated at award, and work in Bradford, Vermont, runs through Sept. 2031.
-
Awards
$16.1B Air Force APAC Propulsion Award Pulled After Erroneous Posting
The Air Force says its Nov. 20 announcement naming 58 companies to the $16.1 billion Advanced Propulsion Acquisition Contract was posted in error. The service still plans to award the IDIQ, with orders competed as requirements are funded.
-
Awards
$871M F108 Turbine Module IDIQ Splits Tinker Engine Work Between Chromalloy and Global Turbine
The Air Force Sustainment Center at Tinker AFB picked Chromalloy and Global Turbine Services for a maximum $871 million multiple-award IDIQ to remanufacture F108 low-pressure turbine modules for the Air Force and Navy, running through 2031.
-
Awards
$16.1B Air Force Propulsion IDIQ Names 58 Vendors, Each Starting With $1,000
The Air Force named 58 companies to its Advanced Propulsion Acquisition Contract, a 15-year IDIQ with a $16.1B ceiling. Each awardee got $1,000, and funding for task orders remains unclear.
-
Awards
$93.2M Navy Order Buys F-35 Depot Test Sets, Cyber Upgrades and Ejection-Seat Repair Capacity
NAVAIR placed a $93.2 million sole-source order with Lockheed Martin for F-35 depot avionics test sets, test program set updates, electronic warfare OS upgrades and expanded ejection-seat repair capacity, with most work in Malabar, Florida, and Nashua, New Hampshire, through January 2030.
-
Awards
Air Force Counter-Air Missile Program Adds Castelion to Low-Cost Interceptor Push
Castelion holds two Air Force CAMP prototype contracts for a ground-launched counter-air missile, launch pod and containerized launcher, joining Sierra Nevada's $124M award and Anduril's launcher work in a program targeting rounds under $500,000.
-
Awards
$985M DLA Base Supply Center IDIQ Opens to 12 AbilityOne Nonprofit Agencies for the Blind
DLA Troop Support awarded 12 AbilityOne nonprofit agencies for the blind seats on a shared $985 million, five-year IDIQ for base supply center supplies serving all military services and civilian agencies, with more awards expected under solicitation SPE8EN-25-R-0004.
-
Awards
$25.9M Frankfurt Military Mail Terminal Contract Goes to Deutsche Post
Deutsche Post AG won a $25.9 million firm-fixed-price Air Force contract to handle mail at Frankfurt International Airport through November 2031, apparently the re-competed Germany Aerial Mail Terminal (GAMT IV) serving APOs across Europe. Three offers were received.
-
Awards
$79.6M Air Force Mod Pushes Northrop F-16 AESA Radar Contract Past $2 Billion
A $79.6 million modification lifts Northrop Grumman's F-16 AESA radar contract (FA8615-17-C-6047) to $2.06 billion, funding work in Linthicum Heights, Maryland, through Dec. 31, 2027 with five procurement and RDT&E lines across fiscal 2025-2027.
-
Awards
B-21 Raider Moves Into Weapons Testing After First Conventional Weapon Release
A B-21 released a conventional weapon over Edwards AFB in early November, which the Air Force says turns Northrop Grumman's stealth bomber from a flight test aircraft into a functional weapons platform as production ramps in Utah and California ahead of a 2027 Ellsworth arrival.