U.S. Army
Every GovConFeed story on U.S. Army — contract awards, policy, enforcement, and protests, newest first.
-
Awards
Army Corps Awards $499M A-E IDIQ to 13 Firms for South Atlantic Military Design Work
USACE Mobile District awards a $499 million multiple-award architect-engineer IDIQ to 13 firms including AECOM, Arcadis-Exp Federal JV, and Burns & McDonnell for military design and construction services across the South Atlantic Division through May 2031.
-
Awards
General Dynamics Lands $229M Contract for 50 Stryker Double V-Hull A1 Vehicles
Army Contracting Command – Detroit Arsenal awards General Dynamics Land Systems a $229 million fixed-price incentive contract for 50 Stryker Double V-Hull A1 infantry carrier vehicles, with delivery from Sterling Heights, Michigan through June 2028.
-
Awards
Northrop Grumman Wins $325M Army Contract for RangeHawk High-Speed Test Resource
Army Contracting Command awards Northrop Grumman a $325 million cost-plus-fixed-fee contract to develop the RangeHawk universal payload architecture, a high-altitude long-endurance airborne test resource designed to collect data on hypersonic and high-speed weapon systems.
-
Awards
BAE Systems Wins $535M Army Contract for Self-Propelled Howitzer Production
Army Contracting Command awarded BAE Systems Land and Armaments a $535.6 million fixed-price-incentive contract for production of self-propelled howitzer systems, vehicles, and total package fielding kits.
-
Awards
Point Blank Enterprises Wins $46M DLA Contract for Enhanced Small Arms Protective Inserts
DLA Troop Support awards Point Blank Enterprises a $46.4 million firm-fixed-price IDIQ for enhanced small arms protective inserts, the hard ceramic plates that provide rifle-round protection in military body armor systems, covering orders through November 2029.
-
Awards
DSA Lands $193M Army eCAP Task Order for Cloud Modernization and AI-Enabled Defense Capabilities
Data Systems Analysts secured a $193 million five-year task order to continue modernizing Army intelligence cloud infrastructure and AI-enabled platforms under the Enterprise Cloud Analytics and Processing program, awarded via the RS3 contract vehicle.
-
Awards
Leidos Wins $2.7B Army Contract to Unify and Accelerate Hypersonic Weapons Production
The Army awarded Leidos a $2.7 billion contract on May 12, 2026, consolidating the Thermal Protection Shield and Common Hypersonic Glide Body programs into a single unified production effort to transition hypersonic weapons from prototyping to fielding.
-
Awards
Pine Bluff Sand and Gravel Wins $141M Army Corps IDIQ for Mississippi River System Maintenance Dredging
The Army Corps of Engineers' New Orleans District awarded Pine Bluff Sand and Gravel Co. a $141 million cost-plus-fixed-fee IDIQ through November 2029 for maintenance dredging — the contract that will keep the lower Mississippi River and Gulf Intracoastal Waterway navigable for the hundreds of millions of tons of cargo that move through the nation's most commercially vital waterway annually.
-
Awards
PCX Aerostructures Wins $105M IDIQ to Overhaul AH-64 Apache Helicopter Rotary Wing Heads
Army Contracting Command awarded PCX Aerostructures LLC a $105 million firm-fixed-price IDIQ on May 4 for the maintenance and overhaul of the rotary wing head — the critical main rotor hub assembly — on AH-64 Apache attack helicopters through May 2031.
-
Awards
Lockheed Martin Wins $212M Army Modification for PAC-3 Missile Logistics and Repair
The Army awarded Lockheed Martin a $212.7 million contract modification on May 12 for PATRIOT Advanced Capability-3 missile and launcher repair and logistics support, bringing the program's cumulative contract value to $875.6 million as PAC-3 demand surges globally.
-
Awards
Palantir Wins Army's TITAN Contract: Boosting AI-Enabled Ground Systems and Shaping the Defense AI Landscape
The U.S. Army awarded Palantir a contract for the Tactical Intelligence Targeting Access Node (TITAN) program, advancing the Army's all-domain operations and AI/ML modernization roadmap with ground-based, AI-enabled targeting capabilities.
-
Awards
KBR Wins $449M LOGCAP V Extensions for U.S. Forces in Europe and National Training Center
KBR Mission Technology Solutions secured two LOGCAP V task order modifications totaling $449M — $304M for EUCOM base operating support and $145M for Fort Irwin's National Training Center logistics.