U.S. Army
Every GovConFeed story on U.S. Army — contract awards, policy, enforcement, and protests, newest first.
-
Awards
Army Adds $34.4M to Amentum's Combat Aviation Brigade Maintenance Contract, Lifting Its Face Value to $469.6M
The Army added $34.4 million to Amentum's worldwide rotary-wing maintenance contract for Combat Aviation Brigades, raising its face value to $469.6 million. Four partner nations paid $8.4 million of the money through Foreign Military Sales, and the work now runs to Nov. 30, 2027.
-
Awards
Navy Seeks Shipyards for USS Michael Monsoor Hypersonic Overhaul, a 27-Month Zumwalt Conversion Starting May 2028
NAVSEA will hold a Dec. 9 industry day and has issued two RFIs for the Conventional Prompt Strike depot modernization of USS Michael Monsoor, a May 2028 to August 2030 job that swaps the destroyer's 155mm guns for a 600-long-ton, 12-missile launch module.
-
Awards
Air Force Counter-Air Missile Program Adds Castelion to Low-Cost Interceptor Push
Castelion holds two Air Force CAMP prototype contracts for a ground-launched counter-air missile, launch pod and containerized launcher, joining Sierra Nevada's $124M award and Anduril's launcher work in a program targeting rounds under $500,000.
-
Awards
$1.6B Lockheed Order Sends PAC-3 MSE Rocket Motor Work to Northrop Grumman
Lockheed Martin placed a $1.6 billion order with Northrop Grumman for the dual-pulse solid rocket motors and ignition safety devices behind the PAC-3 MSE interceptor, scaling production at Allegany Ballistics Laboratory as the Army looks to grow output from about 600 toward 2,000 missiles a year.
-
Awards
Pentagon Picks Seven Laser Teams for Dugway Drone Shoot-Off, With Purchase Orders at Stake
JIATF-401 selected seven high-energy laser teams, including Allen Control Systems, Aurelius, Kord, Thor Dynamics and Yrikka, for mid-December live-fire counter-drone tests at Dugway Proving Ground. Systems that perform well could move straight to purchase orders.
-
Awards
Army Adds Solar-Electric K1000ULE to Battalion Recon in $14.9M Kraus Hamdani Buy
Army Contracting Command awarded Kraus Hamdani Aerospace a $14,948,792 firm-fixed-price contract for Battalion Reconnaissance Unmanned Aircraft Systems after 11 bids. Trade outlets identify the aircraft as the solar-electric K1000ULE, running beside the AeroVironment P550 program.
-
Awards
$2.5M Army Contract Puts Safe Pro Mine Detection on Anduril's Ghost-X
The Army awarded Safe Pro Group a $2.5 million prime contract, its first, to run threat-detection software on Anduril's Ghost-X drone to spot landmines and other explosive threats ahead of M1 Abrams tanks. The award came under a Commercial Solutions Opening and covers test, evaluation and demonstration.
-
Awards
Iowa 155mm Artillery Plant Contract Climbs to $741M as Army Adds $105.8M for MSM
The Army added $105.8 million to MSM Group North America's sole-source contract to design, build and commission a 155mm load, assemble and pack facility at Iowa Army Ammunition Plant. The total is now $740.97 million, up from a $635.2 million ceiling, with completion set for Aug. 10, 2029.
-
Awards
$26M Flyways AI License Goes Sole-Source to Air Space Intelligence for the 618th Air Operations Center
The Air Force issued Air Space Intelligence Federal a $26.02 million sole-source, firm-fixed-price order for cloud-hosted Flyways AI licenses for the 618th Air Operations Center at Scott AFB. It obligated $5 million at award, and the order runs to Sept. 28, 2031.
-
Awards
$4.17B Army Ammunition-Plant MATOC Seats All 11 Bidders
The Army put 11 firms, every bidder, on a $4,171,491,000 design-build MATOC to modernize government-owned, contractor-operated ammunition plants. Awardee CSG says the work spans seven plants, including Holston, Radford and Lake City, with each project competed separately through 2031.
-
Awards
$419M Army Enterprise Software IDIQ Goes to Pegasystems on a Single Bid
Army Contracting Command, Rock Island, awarded Pegasystems a $419 million firm-fixed-price IDIQ for software subscriptions, technical support and outcome-based services through Oct. 28, 2036. One bid was solicited and one received; funding is set order by order, and the ceiling is not guaranteed spend.
-
Awards
Army Project Griffin Pilot Puts $2.6M Into Agentic AI Cyber Defense With AWS and WWT
The Army picked Amazon Web Services and World Wide Technology for Project Griffin, a $2.6M combined pilot to build agentic AI that detects and counters network threats faster than human operators. It is one of the first efforts under Project ARDS and drew more than 100 industry submissions.