U.S. Army
Every GovConFeed story on U.S. Army — contract awards, policy, enforcement, and protests, newest first.
-
Awards
General Dynamics Land Systems Wins $716M Sole-Source Army Contract to Sustain Abrams Tank Fleet Through 2031
Army Contracting Command awarded GDLS a $716M cost-plus-fixed-fee contract to maintain, field, and train on the M1 Abrams family and combat engineering vehicles — the only proposal received.
-
Awards
Leidos Wins $869M Army Contract to Build AI-Powered Battlefield Decision System
The Army awarded Leidos an $869M five-year contract under the MACRO II program to integrate AI across all warfighting domains, helping commanders process multidomain data faster than ever.
-
Awards
Army Awards $49M NCODE Contract to Eight Firms in Bid to Shield Small Defense Suppliers From Cyberattacks
Eight small businesses won spots on the Army's five-year NCODE contract to provide CMMC and NIST SP 800-171 compliance support to DIB small businesses through a managed secure cloud enclave, beating out 31 competing proposals.
-
Awards
Raytheon books $441.6M PATRIOT GEM-T modification to replenish stocks consumed in Operation Epic Fury
Modification P00026 to W31P4Q-23-C-0036, awarded April 30 and announced May 1, 2026 — work runs through September 30, 2026 at the Chambersburg, PA plant. Fully funded with FY26 special funds.
-
Awards
Leidos' Dynetics wins $617.2M Army order for 53 IFPC Inc 2 systems — total program ~$1.2B
April 23, 2026 award via Leidos' Dynetics subsidiary funds 53 Indirect Fire Protection Capability Increment 2 systems plus continued R&D through 2029. Combined with $356M from July/Sept 2025, total now ~$1.2B in production contracts.
-
Awards
Raytheon books $904.6M Army LTAMDS modification — five units + six spares, work through 2031
April 16, 2026 modification raises cumulative LTAMDS value to ~$5.36B. Andover, MA performance through Aug. 29, 2031. Single bid received via online solicitation; $725.9M FY2026 missile-procurement funds obligated at award.
-
Awards
Bell V-280 Valor (now MV-75) — first FLRAA flight in 2026, production 2028, fielded 2030
The Army's Future Long-Range Assault Aircraft (Black Hawk replacement) is now designated MV-75. Bell Textron won the December 2022 contract; first prototype flight scheduled 2026, low-rate initial production 2028, initial fielding 2030.
-
Awards
Army awards Anduril $20B enterprise deal — and quietly redraws the procurement map
The Army consolidated 120 separate Anduril contracts into one 10-year, $20B-ceiling enterprise vehicle built around the Lattice platform. The first task order is already out. What it signals for non-traditional vendors and the small firms beneath them.
-
Awards
Salesforce wins $5.6B Army IDIQ — the largest commercial SaaS deal in DoD history
A 10-year IDIQ executed through a wholly-owned subsidiary brings agentic AI, Slack, and Salesforce's data fabric to the Department of War. The deal is also a signal: predictable pricing and days-not-months procurement timelines are the new ask.
-
Awards
Lockheed Martin lands $4.76B PAC-3 contract — but 94% of the money is foreign
An undefinitized contract action signed April 10 obligates $4.76B for Patriot interceptor production through 2030. Only $265M of it is U.S. Army money. The deal is a window into how Foreign Military Sales now drive missile-line throughput.