U.S. Navy
Every GovConFeed story on U.S. Navy — contract awards, policy, enforcement, and protests, newest first.
-
Awards
HII Unmanned Systems Gets $37M Lionfish Small Unmanned Undersea Vehicle Contract Modification
HII Unmanned Systems received a $37M firm-fixed-price modification on May 7 for Lionfish Small Unmanned Undersea Vehicle production and support equipment, continuing deliveries to the Navy from Pocasset, Massachusetts, through May 2027.
-
Awards
General Dynamics Mission Systems Awarded $66M for Virginia- and Columbia-Class Submarine Data System
General Dynamics Mission Systems won a $66.2M SBIR Phase III IDIQ on May 7 to deliver the Data Acquisition and Retrieval System for Virginia- and Columbia-class submarines, with work across Groton, CT, and test ranges in Florida and the Bahamas through May 2031.
-
Awards
Applied Research Associates Wins $111.5M Naval Research Laboratory High-Performance Computing IDIQ
Applied Research Associates landed a $111.5M IDIQ from the Naval Research Laboratory on May 8 for high-performance computing R&D support, including cryptographic capability development and network protocol design at the NRL's Washington, D.C. facility.
-
Awards
CACI Wins $113.8M Military Sealift Command IT Contract in Four-Bidder Competition
CACI Inc.-Federal beat out three other firms for the Military Sealift Command Integrated Business Systems contract, covering IT sustainment and modernization through 2031.
-
Awards
Lockheed Martin Wins $407M to Advance Aegis Guam Missile Defense to Combat-Ready Status
The Missile Defense Agency modified Lockheed Martin's Aegis Guam contract by $407M, pushing the total program value past $1.9B as the Pacific deterrent system moves toward engineering certification.
-
Awards
Navy Awards HII's Ingalls Shipbuilding $283M to Start FF(X) Frigate Construction After Constellation-Class Cancellation
Ingalls Shipbuilding secured a $283 million lead yard support contract on April 28 to begin cutting steel and procuring long-lead materials for the FF(X) frigate, which replaces the cancelled Constellation-class program and targets first delivery by 2028.
-
Awards
Navy Commits $103M to Submarine Test Infrastructure in Back-to-Back Awards to General Dynamics and HII
Two May 7 contract awards totaling $103M expand the Navy's submarine test and unmanned undersea vehicle programs: a $66M SBIR III IDIQ to General Dynamics Mission Systems for Virginia- and Columbia-class test data systems, and a $37M Lionfish UUV production option to HII.
-
Awards
NAVAIR Awards Lockheed Martin $14.5M to Instrument F-35C Test Jets for Carrier Suitability Trials as Block 4 Testing Gap Widens
A $14.5M cost-plus-incentive-fee contract awarded to Lockheed Martin by Naval Air Systems Command covers installation of flight test instrumentation on CF-5 aircraft to bridge a gap in F-35C carrier suitability testing until dedicated flight science jets become available.
-
Awards
AAR books $305M follow-on Navy/Marine Corps C-40A clipper sustainment contract
Long-running C-40A (Navy version of Boeing 737-700) maintenance, supply, and engineering support — extends AAR's incumbent position on the Navy's logistics-airlift fleet.
-
Awards
Navy awards $325.9M MAC to eight shipbuilders for up to 474 composite rigid-hull inflatable boats
April 30 award announced May 1, 2026 — total potential value $650.1M over 10 years. Spreads small-craft procurement across multiple yards instead of a single supplier.
-
Awards
Raytheon books $206M Navy JPALS contract to add M-Code GPS to carrier landings
Late-April 2026 award. Cost-plus-incentive-fee through April 2030 funds design, integration, test, and four engineering development models adding M-Code GPS to the AN/USN-3(V)1 Joint Precision Approach and Landing System.
-
Awards
Raytheon books $213M Navy modification for Zumwalt-class combat systems
April 20, 2026 modification by NAVSEA exercises options on prior Zumwalt combat-systems contract. Funds installation, integration, development, testing, and modernization across six U.S. locations through April 2027.