Raytheon was awarded a potential $212.12 million Navy contract on March 16, 2026 for operations and maintenance of the AN/TPS-71 Relocatable Over-the-Horizon Radar (ROTHR) network covering the Caribbean and Gulf of Mexico through 2031. Per the Army Recognition coverage of the Pentagon's March 16 contract announcement and Naval Technology.
Contract structure
- Base period: 1 year, $40.25M
- 4 option years
- Total potential value: $212.12M through April 2031 if all options exercised
- $1M of FY2026 Navy O&M funds obligated at award
The ROTHR network
Operations control center in Chesapeake, Virginia. Three land-based bistatic Doppler radar sectors (separate transmit and receive sites): Chesapeake/New Kent (Virginia), Freer/Premont (Texas), and Juana Diaz/Vieques (Puerto Rico). The system bounces HF signals off the ionosphere to detect aircraft and small vessels thousands of miles past line-of-sight — primary mission is counter-narcotics surveillance over the Caribbean and Gulf, supporting Joint Interagency Task Force South.
Subcontract footprint
- Antenna-field maintenance subs across VA, TX, and PR sites
- RF specialty firms (HF transmitter tubes, T/R modules)
- Software-defined-radio modernization is the natural pull-through of these recurring O&M awards