The Navy's next number-two civilian wants collaborative combat aircraft flying off carriers before the service's next fighter shows up, and he wants a foreign shipbuilder to stand up a new American yard for frigates rather than have warships built abroad. William Toti, who has performed the duties of Navy undersecretary since May and is the White House pick for the job, laid out both positions at his Senate Armed Services Committee confirmation hearing on Thursday, Nov. 19, Defense One reported.
The two answers touch the Navy's biggest open bets: how fast unmanned aircraft join the carrier air wing, and where the fleet's surface combatants get built while Congress argues over foreign yards. No committee vote or confirmation outcome had been reported in the sources reviewed.
Why Toti Wants CCAs on Carriers Before F/A-XX Arrives
Toti told senators the Navy does not need to wait for F/A-XX to start pairing carrier jets with drone wingmen. "I think we can probably start integrating systems before F/A-XX delivers. Having said that, F/A-XX is a critical capability. We're going to have these aircraft carriers around for the next 50 years, and the notion that the F-35 is the last last airplane that's going to be launched from them is just a non-starter," he said, according to Defense One.
He said control of collaborative combat aircraft will likely be built into F/A-XX "from ground up," but added: "But I think it's a capability we'll be able to use with F-35, specifically, as well." That suggests the near-term integration work would run through the F-35 and existing carrier systems, not a fighter that is still years from flight.
"CCA aircraft are an element of the future air fleet, the future combat capability of our aircraft carriers," Toti said. He credited the Air Force with leading the effort and said the Navy is "following closely behind," adding: "We need low-cost attritable assets in our air wing, and CCA will provide that."
The timeline explains the urgency. In September the Navy picked Boeing to build F/A-XX, which is expected to fly in the 2030s, and Defense One noted that the Trump administration offered only the barest support for the program in its 2027 budget request. Also in September, the Navy issued a prototype-focused request for information on CCAs that included integration with aircraft carriers. A month later, the Air Force tested two of its CCAs in air combat maneuvers.
A Foreign-Backed Frigate Yard on U.S. Soil, Not Hulls Built Abroad
On shipbuilding, Toti drew a distinction that a defense.info commentary by Robbin Laird said the current shipbuilding argument has mostly blurred. He declined to back building warships in foreign yards beyond auxiliaries. Instead, he argued for a foreign shipbuilder to invest in a new American yard devoted to frigates and large surface combatants, and he framed the operational need bluntly: "We have destroyers today doing frigate work."
According to the press account defense.info relays, Toti singled out Korean and Japanese yards as the world's best at production, while noting that this was a judgment about production methods and not about the quality of their ships. Sen. Angus King observed that the proposal differs from building ships overseas and said the conversation would continue.
The idea has roots elsewhere in the administration. Acting Navy Secretary Hung Cao told lawmakers in May that the United States wants foreign yards to invest in U.S. shipbuilding, pointing to South Korea's Hanwha, which bought a Philadelphia shipyard in 2024, defense.info noted. Chief of Naval Operations Adm. Daryl Caudle said the idea would get a full hard look from him and his advisers.
How the House and Senate FY27 NDAA Texts Split on Foreign Yards
Toti's position lands between two versions of the FY27 National Defense Authorization Act. The House bill bars foreign construction of both warships and combat logistics ships. The Senate Armed Services version limits warship construction abroad but permits up to two auxiliaries from foreign yards that invest in the U.S. maritime industrial base. The final bill has not passed.
The administration is pushing further than either chamber. In August, the president signed a memo broadening the "Finland model" used for the Coast Guard's Arctic Security Cutters, under which foreign builders that commit to moving future work to the United States could build up to two ships in each of three classes at their home yards first. The administration has also asked Congress to let the Navy commission foreign yards for two surface combatants and two auxiliaries, and it has requested $1.85 billion in reconciliation funding to study using foreign yards for U.S. warships and possibly to pay for an initial vessel built in Japan or South Korea.
Toti's version would keep combatant construction in the United States while importing the production system, which appears to fall outside the overseas warship construction limits both chambers have written.
Can a New Yard Survive the Shipbuilding Budget Math?
Funding is the open question. Defense.info, citing a Congressional Budget Office assessment, reported that the Navy's 2027 shipbuilding plan would average about $53.8 billion a year in appropriations, roughly 41 percent above the $38.1 billion the Navy has secured annually over the last five years. Senate appropriators have proposed $41.6 billion for shipbuilding, about $18.5 billion below the Navy's request.
CBO also projects that construction would be fastest over the next decade, slow from the mid-2030s to the mid-2040s, and ramp again later. Laird argued that a yard dedicated to frigates and large combatants needs an order book that survives that trough, and that a foreign investor will price the risk. Toti did not specify what terms he has in mind, according to the defense.info account.
What It Means for Contractors
For aviation suppliers, Toti's testimony suggests carrier CCA integration work could start against the F-35 and current air wing systems rather than waiting on F/A-XX. Firms working on autonomy, data links, mission software and carrier launch-and-recovery for unmanned aircraft should watch for follow-on solicitations from the September RFI and for how the Navy funds integration before Boeing's fighter matures.
For shipbuilders and the maritime supply base, a foreign-backed U.S. yard would create a new prime-level competitor for frigate and surface combatant work, along with new demand for steel, outfitting, modules and skilled labor at a greenfield site. Korean and Japanese builders, and U.S. firms that could partner with them, have the most direct stake. Existing domestic yards should track whether the final NDAA language and any multi-year procurement commitments make that kind of investment viable.
Two near-term markers matter: whether the conference NDAA adopts the Senate's auxiliary exception or the House's ban, and whether the committee advances Toti's nomination.