Policy
FAR and DFARS rulemaking, executive orders, and acquisition policy shifts — explained in plain English.
-
Policy
FTC + DOJ joint focus on cybersecurity — and what that means for federal contractors in 2026
Cybersecurity enforcement now spans FTC (consumer protection / Made-in-America claims), DOJ (False Claims Act on DFARS 7012), and DoD (CMMC). Federal contractors face overlapping enforcement reach. Compliance investments now defend against multiple enforcement vectors simultaneously.
-
Policy
CHIPS Act status: $30.9B awarded to 19 firms, but the tax credit expires December 2026
As of mid-2025, Commerce has awarded $30.9B direct + $5.5B loans across 19 semiconductor companies and 40 projects. The Advanced Manufacturing Investment Tax Credit (Section 48D) sunsets for construction starts after December 31, 2026.
-
Policy
Expanded counterfeit-parts rule: 60-day GIDEP reporting, supply-chain flowdown, FCA exposure
A final rule effective November 22 dramatically expanded mandatory GIDEP reporting for counterfeit or suspect-counterfeit parts. 60-day reporting window, supply-chain flowdown to all tiers, False Claims Act exposure for non-compliance.
-
Policy
Davis-Bacon's $217B federal construction world — first major overhaul in 40 years, penalties now $13,508
The Department of Labor finalized the first major Davis-Bacon regulatory overhaul in nearly 40 years. Updated WH-347 certified payroll form (January 2025), civil penalties increased to $13,508 per violation. $217B in annual federal construction and 12,000+ active projects now subject to the tightened framework.
-
Policy
CISA retires 10 emergency directives — and what it signals about federal cyber norm-setting
On January 8, 2026, CISA announced the retirement of 10 emergency directives issued between 2019-2024. The retirement signals a shift toward targeted, threat-specific guidance over sweeping standing directives — with implications for how contractors respond to future cybersecurity requirements.
-
Policy
OMB M-25-22 reshapes federal AI procurement — effective for solicitations after September 30, 2025
The Trump administration's OMB memorandum on federal AI procurement applies to any AI solicitation issued after September 30, 2025. Three big themes: a competitive American AI marketplace, taxpayer-dollar safeguards via AI performance tracking, and cross-functional procurement engagement.
-
Advertisement
-
Policy
Federal workforce down 271,000 in 2025 — and contractors are absorbing the displaced work
The federal civilian workforce declined by 249,000-271,000 (9%) between January and November 2025 — the largest peacetime reduction on record. RIF moratorium expired January 30; implementation plans due April 14. Contractors absorb workload by default.
-
Policy
Trump's March 13 Made-in-America EO — FTC enforcement + contract-level origin verification
The March 13, 2026 executive order directs the FTC to prioritize enforcement against false 'Made in America' claims and requires federal agencies to verify Made-in-USA and Buy American Act claims at the contract level. Online marketplace verification rule forthcoming.
-
Policy
Trump's January 7 Warfighter EO — stock-buyback ban for 'underperforming' defense primes
The January 7, 2026 EO 'Prioritizing the Warfighter in Defense Contracting' directs DoW to identify underperforming primes, prohibit their stock buybacks and dividends until performance issues cure, and link future executive compensation to performance metrics.
-
Policy
SBA suspends 1,000+ firms, terminates 800+ in 8(a) program — and shifts to race-neutral review
A cascade of enforcement actions in Q1 2026: over 1,000 8(a) firms suspended, 800+ in termination proceedings, and formal guidance that 8(a) eligibility is now evaluated on individualized social-disadvantage evidence, not group membership. New-firm admissions dropped from ~525/year to 65 in 2025. What current participants actually need to do.
-
Policy
WOSB and EDWOSB Certification: How It Actually Works (Self-Certification Ended in 2020)
WOSB/EDWOSB self-certification for federal set-asides ended October 15, 2020, not February 2026 as originally reported — corrects the article's invented 2026 date with the real history and explains the three current certification paths.
-
Policy
FedRAMP 20x Phase 2 ends in March — wide-scale rollout coming Q3-Q4 2026
FedRAMP's 20x program — the cloud authorization rebuild — exits Phase 2 pilot March 31. Phase 3 opens authorization to all Low and Moderate cloud providers in Q3-Q4. Authorization timelines drop from 18+ months to ~3 months for compliant providers.