Northrop Grumman
Every GovConFeed story on Northrop Grumman — contract awards, policy, enforcement, and protests, newest first.
-
Policy
Navy Raises T-45 Replacement Price Ceiling to $2.7B, Nearly $1 Billion Above Original Cap, as Proposals Near Deadline
NAVAIR lifted the UJTS trainer jet price ceiling from $1.75B to $2.7B — a $950M jump — citing a revised program cost estimate. Three teams remain in competition ahead of the June 29 proposal deadline, with contract award targeted for early 2027.
-
Awards
Army Issues RFI for 11,000 Next-Generation Stinger-Replacement Missiles, Eyes FY28 Production Start
The U.S. Army's Maneuver Short Range Air Defense program issued a Request for Information on June 5, 2026, seeking contractors capable of delivering 11,000 Next Generation Short Range Interceptor missiles and 2,200 Control Launch Assemblies over a 10-year production run beginning in FY28. Industry responses are due July 6, 2026.
-
Policy
House Passes Iran War Powers Resolution 215–208, Contractors Monitor Budget and Demand Implications
The House voted 215–208 on June 3 to require withdrawal of U.S. forces from Iran operations within 30 days. The resolution faces a Senate filibuster and near-certain veto, but its passage signals congressional unease with prolonged conflict — with real budget and demand consequences for defense contractors.
-
Awards
Northrop Grumman Wins $99.96M Sole-Source Navy IDIQ to Operate and Sustain GQM-163A Coyote Targets
Northrop Grumman Systems Corp. of Chandler, Arizona, has been awarded a $99,959,797 cost-plus-fixed-fee, cost-reimbursable IDIQ to produce flight trajectories and technical data packages and to operate, maintain, and load GQM-163A Coyote supersonic targets for the Navy through May 2031. The award was not competed.
-
Policy
House Armed Services Committee Releases $1.15 Trillion FY2027 NDAA Chairman's Mark, Markup Set for June 4
The House Armed Services Committee released its $1.15 trillion FY2027 NDAA chairman's mark on May 26, 2026, authorizing multiyear procurements for F-35s, destroyers, and amphibious vessels while requiring a second solid rocket motor manufacturer.
-
Awards
Northrop Grumman Wins $49M Air Force Contract for Joint Threat Emitter Software Support
The Air Force Life Cycle Management Center at Hill Air Force Base awarded Northrop Grumman a $49 million cost-plus-fixed-fee contract on May 20 for software support for the Joint Threat Emitter program, which simulates adversary radar and missile threats to train pilots and electronic warfare crews.
-
Awards
Stephenson Stellar Wins $98M Sole-Source Engineering Support IDIQ for Air Force Global Strike Command
The Air Force awarded Shreveport-based Stephenson Stellar a $98 million sole-source engineering support IDIQ at Barksdale Air Force Base to address areas of high interest affecting the national security posture of Air Force Global Strike Command, covering the nuclear bomber and ICBM missions through May 2031.
-
Awards
Northrop Grumman Wins $697M Marine Corps Radar Sustainment Agreement for G/ATOR Portfolio
Marine Corps Systems Command awarded Northrop Grumman a $697 million basic ordering agreement for sustainment engineering and logistics of the Ground/Air Task Oriented Radar system and related expeditionary radar programs through 2031.
-
Awards
Lockheed Martin Wins $879M F-35 Armament Contract for Lots 18 and 19
The Pentagon awarded Lockheed Martin a $879 million modification for F-35 armament integration covering production Lots 18 and 19, continuing the program's decade-long weapons modernization track.
-
Awards
Northrop Grumman Wins $325M Army Contract for RangeHawk High-Speed Test Resource
Army Contracting Command awards Northrop Grumman a $325 million cost-plus-fixed-fee contract to develop the RangeHawk universal payload architecture, a high-altitude long-endurance airborne test resource designed to collect data on hypersonic and high-speed weapon systems.
-
Awards
Northrop Grumman Awarded $398M Sole-Source OTA for Space Force SATCOM Development
Space Systems Command awards Northrop Grumman a $398 million firm-fixed-price contract for space vehicle development, launch, and on-orbit support for a classified SATCOM program, using sole-source authority under 10 U.S.C. § 4022.
-
Awards
Northrop Grumman Gets $196M NAVAIR Contract for MQ-4C Triton Logistics and ISR Support
NAVAIR awards Northrop Grumman a $196 million cost-plus-fixed-fee modification to provide logistics, field support, and intelligence reach-back services for the MQ-4C Triton maritime surveillance drone through May 2027.