Northrop Grumman
Every GovConFeed story on Northrop Grumman — contract awards, policy, enforcement, and protests, newest first.
-
Policy
Golden Dome Runs on Frozen 2025 Money as the Dec. 11 Stopgap Deadline Nears
Golden Dome kept running after Oct. 1 on reconciliation money that lasts until 2029. But the CR gives it no new funding, no new obligations have been tagged to it, and at least 95% of the FY2027 request depends on a bill Congress has not passed. Here is what that means for SBI, SHIELD and other bidders.
-
Awards
Army Taps Lockheed PAC-3 Edge for $1B-Plus Future Interceptor Prototype Deal
The Army selected Lockheed Martin for its Future Interceptor program under an Other Transaction agreement valued above $1 billion, with Lockheed expected to fund $423 million and the government about $660 million. PAC-3 Edge testing is planned for 2027, with deployment targeted by 2031.
-
Awards
Army Puts Up to $60M Behind L3Harris Ramjet Drone Interceptor for XRC Flight Tests
Army XRC program moves L3Harris into flight testing of a ramjet-powered long-range drone interceptor under a three-year contract worth up to $60 million from DEVCOM AvMC, with full value tied to continued funding.
-
Awards
$3.5M Air Force Bet on Natilus KONA Targets 'Sub-Tactical' Pacific Airlift
The Air Force is funding $3.5M for Natilus's KONA blended-wing freighter, an optionally manned aircraft carrying just over 8,000 lb for 800 nm, aimed at the gap between converted Cessnas and the C-130 for dispersed Indo-Pacific logistics. Full-scale flight testing is slated for late 2027 or early 2028.
-
Awards
$75M MDA Award Sends Long Wall's Cyclops Low-Cost Interceptor Into Flight Testing
Long Wall says MDA awarded it $75 million to finish flight testing its self-funded Cyclops midcourse interceptor, a mass-producible design sized to fit a shipping container, and that it will match the award with $75 million of its own money.
-
Policy
Pentagon and Lockheed Set 10-Year F-35 Framework for 850 U.S. Jets, Pending Congress
The Pentagon and Lockheed Martin agreed on a 10-year framework for F-35 Lots 21-30: 156 jets a year, 850 for the U.S., and at least $7 billion in Lockheed investment. It still needs multiyear procurement authority and FY2027 appropriations from Congress, and pricing and schedules are not set.
-
Awards
Navy Gets First C-130J-30 for E-130J Phoenix II, Starting E-6B TACAMO Replacement
Lockheed Martin delivered the first C-130J-30 for the Navy's E-130J Phoenix II on Oct. 15. Northrop Grumman will convert it for the TACAMO nuclear submarine communications mission, with 31 E-130Js planned to replace 16 E-6Bs.
-
Policy
Sentinel ICBM Review Reopens as Air Force Eyes Land for 120 New Silos
The Air Force opened a supplemental environmental review of the Sentinel ICBM program after abandoning plans to convert Minuteman III sites, and may buy land for up to 120 new silos near F.E. Warren, Malmstrom and Minot. A draft is due fall 2027, the final in spring 2028.
-
Awards
$21M Army IBCS Order Swaps Command Tent for Northrop Expandable Van
Army taps Northrop Grumman for a $21M IBCS variant that swaps the command tent for a protected expandable van; two manufacturing prototypes with six operator and four staff stations are due by June 2027, backed by $10M+ of company cost-sharing.
-
Awards
$1.7B Ceiling on Navy SEWIP Block II Order Keeps Lockheed Building SLQ-32(V)6
Navy gave Lockheed Martin a $209M firm-fixed-price modification to build AN/SLQ-32(V)6 SEWIP Block II electronic warfare systems through 2029, with options to about $1.71B, ahead of a potential $7.13B multiple-award AN/SLQ-32 contract.
-
Policy
Section 815 Buyback Limits Split Unions and Chamber as NDAA Heads to Conference
Labor unions want the Senate NDAA's Section 815 kept in the final bill; the U.S. Chamber wants it cut. The provision would bar Pentagon contracts with firms paying buybacks or dividends absent a waiver. The House bill has no such language.
-
Awards
Navy Picks Boeing for F/A-XX Carrier Fighter in $20B-Plus Development Deal
The Pentagon says the F/A-XX full-scale development contract is worth more than $20B. Boeing will build the Navy's first sixth-generation carrier fighter, its second such win after the Air Force F-47, and outlets differ on why it beat Northrop Grumman.