Textron
Every GovConFeed story on Textron — contract awards, policy, enforcement, and protests, newest first.
-
Awards
Navy T-45 Replacement Down to One Bidder as SNC Exits UJTS, Leaving Textron-Leonardo M-346N
Sierra Nevada Corporation skipped the Oct. 30 UJTS proposal deadline, saying it could not responsibly bid under the current contract structure. That leaves Textron Aviation Defense and Leonardo's M-346N as the only known bidder for up to 216 Navy trainer jets, with an award now planned for the fourth quarter of fiscal 2027.
-
Awards
Boeing Withdraws From Navy UJTS Jet Trainer Competition, Leaving Textron and SNC in $2.7B T-45 Replacement Race
Boeing withdrew from the Navy's $2.7B UJTS competition in June 2026, citing engine qualification timelines for the T-7A Red Hawk. Textron Aviation Defense and SNC remain as the only two competitors to replace the T-45 Goshawk.
-
Awards
Bell V-280 Valor (now MV-75) — first FLRAA flight in 2026, production 2028, fielded 2030
The Army's Future Long-Range Assault Aircraft (Black Hawk replacement) is now designated MV-75. Bell Textron won the December 2022 contract; first prototype flight scheduled 2026, low-rate initial production 2028, initial fielding 2030.