U.S. Army
Every GovConFeed story on U.S. Army — contract awards, policy, enforcement, and protests, newest first.
-
Awards
General Atomics Joins Army's Three-Way Extended-Range Artillery Race With 74-Mile Projectile After Successful Yuma Test
The Army announced a contract for General Atomics Electromagnetic Systems under the Extended Range Artillery Projectile program, adding a third competitor alongside General Dynamics and BAE Systems in a race to field a 155mm guided round capable of hitting targets beyond 65 kilometers.
-
Awards
DISA Posts $850M Sources Sought for Army Endpoint Security Recompete as Incumbent Everforth ECS Faces Challenge
DISA posted a sources-sought notice on June 16, 2026, for the Army Endpoint Security Event Management System, a consolidated $850M recompete covering Army enterprise and tactical networks. Incumbent Everforth ECS holds both current contracts, both expiring in 2027.
-
Awards
Day & Zimmermann Wins $2.3B Army Contract to Operate Nation's Largest Ammunition Depot Through 2046
The Army awarded Day & Zimmermann Hawthorne Corp. a $2.3B firm-fixed-price contract on June 9, 2026, to operate, maintain, and modernize Hawthorne Army Depot in Nevada — the U.S. military's largest ammunition storage facility — through December 2046.
-
Awards
Leidos Wins $2.7 Billion Army Contract to Produce Dark Eagle Hypersonic Missiles
Leidos landed a $2.7 billion FAR Part 15 contract from Army Contracting Command at Redstone Arsenal to consolidate and scale production of the Dark Eagle Long-Range Hypersonic Weapon, transitioning the program from OTA development into conventional acquisition.
-
Awards
Army Posts FRAM II RFP for Apache, Black Hawk, and Chinook Fleet Maintenance at Fort Novosel — Proposals Due July 14
The Army posted the Fort Rucker Aviation Maintenance II solicitation June 9, covering full maintenance of AH-64E Apache, CH-47F Chinook, UH-60M Black Hawk, and UH-72A Lakota fleets at Fort Novosel, Alabama. Proposals are due July 14. Incumbent M1 Support Services is bridging under a $601M modification.
-
Awards
Marines Eye Second JLTV Supplier as Oshkosh Alleges 20-Month AM General Delivery Gap
The Marine Corps closed an RFI June 10 exploring a second JLTV supplier, with Oshkosh Defense publicly alleging a 20- to 24-month delivery gap from current vendor AM General. The Marines are replacing their entire Humvee fleet with the JLTV.
-
Awards
Army Awards $212M Dual-Vendor Mortar Tail Fin Contract to Two Small Businesses
Army Contracting Command split a $212M firm-fixed-price contract for 60mm, 81mm, and 120mm mortar tail fins between Machining Technologies Inc. and Globe Tech LLC, using a dual-vendor structure that will compete individual orders between the two small businesses through June 2031.
-
Awards
Army Issues RFI for 11,000 Next-Generation Stinger-Replacement Missiles, Eyes FY28 Production Start
The U.S. Army's Maneuver Short Range Air Defense program issued a Request for Information on June 5, 2026, seeking contractors capable of delivering 11,000 Next Generation Short Range Interceptor missiles and 2,200 Control Launch Assemblies over a 10-year production run beginning in FY28. Industry responses are due July 6, 2026.
-
Awards
Sherpa 6 Wins $240M Sole-Source Army SBIR Phase III Contract for Chemical and Biological Detection Technologies
Army Contracting Command awarded Sherpa 6 Inc. a $239.6M sole-source SBIR Phase III contract (W912CG-26-D-A001) for chemical and biological detection and Soldier protection technologies, with a five-year period of performance through June 2031.
-
Awards
Army Buys 82 AeroVironment P550 Drones for $117M to Push Long-Range Reconnaissance Down to Battalion Level
Army Contracting Command awarded AeroVironment a $117.3M firm-fixed-price contract for 82 P550 Group 2 VTOL drones selected from 10 bids, with delivery expected by July 23, 2026, extending persistent ISR to battalion commanders.
-
Awards
L3Harris Lands $495M Army Modification, Pushing Communications Contract Ceiling to $3.8B
The Army added $495 million to an L3Harris communication systems contract, lifting its cumulative face value to roughly $3.8 billion. The award drew one bid via internet solicitation, with work completion estimated for December 1, 2026.
-
Awards
3dB Labs Wins $350M Army Contract for Spectrum Situational Awareness System
Army Contracting Command awards 3dB Labs a $350M firm-fixed-price contract to produce the Spectrum Situational Awareness System (S2AS), a 57x scale-up from a $6.1M OTA prototype awarded just 13 months earlier.