U.S. Navy
Every GovConFeed story on U.S. Navy — contract awards, policy, enforcement, and protests, newest first.
-
Awards
Lockheed Martin Wins $2.29 Billion Navy IDIQ for F-35 Global Sustainment
The U.S. Navy awarded Lockheed Martin a $2.293 billion cost-plus-incentive-fee IDIQ (contract N00019-26-D-0004) for F-35 Lightning II initial sustainment across all variants, covering Navy, Marine Corps, and allied partner aircraft through 2030.
-
Awards
Navy Awards $249.9M LIIS-CMDS Logistics IT Modernization IDIQ to 59 Firms
The Navy awarded the $249.9M LIIS-CMDS IDIQ to 59 of 72 offerors across two lots on June 11 to modernize logistics data integration and software capability for fleet readiness through 2031.
-
Awards
Precise Systems Wins $116.8M NSWC Crane Electronic Warfare Depot Contract
Precise Systems Inc. wins a $116.8M five-year contract from NSWC Crane to provide engineering, logistics, and depot-level sustainment for Navy and joint force airborne electronic attack warfare systems.
-
Awards
Boeing Withdraws From Navy UJTS Jet Trainer Competition, Leaving Textron and SNC in $2.7B T-45 Replacement Race
Boeing withdrew from the Navy's $2.7B UJTS competition in June 2026, citing engine qualification timelines for the T-7A Red Hawk. Textron Aviation Defense and SNC remain as the only two competitors to replace the T-45 Goshawk.
-
Awards
Saronic and Castelion to Arm 180-Foot Autonomous Warship With Hypersonic Missiles in First-Ever Maritime Launch Demo
Saronic and Castelion announced June 11 they will integrate Castelion's Blackbeard hypersonic vehicle onto the 180-foot Marauder MUSV — the first hypersonic system ever mounted on an autonomous surface vessel — with a maritime launch demo planned for 2027.
-
Awards
Noblis Wins $309M NIWC Pacific C4ISR IDIQ for Navy Network Integration Engineering Facility
Noblis secured a $309M, 5-year single-award IDIQ from NIWC Pacific to deliver C4ISR systems engineering and lifecycle support for the Navy's Network Integration Engineering Facility — the firm's third successive win on this contract line.
-
Awards
Navy Awards Woodward $51.7M Sole-Source IDIQ for Next-Gen Ship Gas Turbine Digital Controls
The Navy awarded Woodward Inc. a $51.7M sole-source IDIQ on June 8, 2026 for up to 123 next-generation FADEC cabinets for ship service gas turbine generators, with work at Woodward's Fort Collins facility through January 2031.
-
Awards
Navy Gives BlueForge Alliance Another $400M to Strengthen the Submarine Industrial Base
Naval Sea Systems Command awarded BlueForge Alliance (Bryan, TX) a $400M firm-fixed-price contract modification to support and uplift the Submarine Industrial Base through September 2027, pushing the organization's cumulative DoD funding past $1.5 billion.
-
Awards
Raytheon Wins $515M Navy Contract Modification to Expand SPY-6 Radar Production and Upgrades
Naval Sea Systems Command awarded Raytheon Missiles and Defense a $515,822,691 modification to its SPY-6 family of radars Integration and Production Support contract, covering Flight IIA destroyer upgrades, Foreign Military Sales to Germany, and domestic production across eleven U.S. sites through May 2027.
-
Awards
Northrop Grumman Wins $99.96M Sole-Source Navy IDIQ to Operate and Sustain GQM-163A Coyote Targets
Northrop Grumman Systems Corp. of Chandler, Arizona, has been awarded a $99,959,797 cost-plus-fixed-fee, cost-reimbursable IDIQ to produce flight trajectories and technical data packages and to operate, maintain, and load GQM-163A Coyote supersonic targets for the Navy through May 2031. The award was not competed.
-
Awards
Fuse Integration Wins $96.1M Navy Order for KRAKEN Tactical-Edge Networking Kits
San Diego small business Fuse Integration secured a $96.1 million firm-fixed-price Navy order for CORE 5 network controllers, KRAKENs and KRAKEN Mobile units, extending Beyond Line of Sight mesh networking to tactical platforms. The sole-source order runs through February 2028.
-
Awards
General Dynamics Mission Systems Wins $106M MUOS Ground-Segment Sustainment Task Order, $294.9M With Options
General Dynamics Mission Systems received a $106 million task order for baseline sustainment and obsolescence support of the MUOS ground segment, with a total value of $294.9 million if all options are exercised, running through May 2031.