Space Development Agency
Every GovConFeed story on Space Development Agency — contract awards, policy, enforcement, and protests, newest first.
-
Awards
$9.9M SDA Study Tests SpaceX's Plug and Play Laser for Missile Tracking
The Space Development Agency awarded SpaceX a $9.9 million BAA contract, worth up to $12.7 million with options, for a risk reduction study on its Plug and Play Laser (Plaser), including representative hardware and support to missile warning and tracking system integration.
-
Awards
$1.37M Buys Space Force Its First Operational Commercial Space Reserve, Six SDA Firms In
Space Systems Command awarded the first operational Commercial Augmentation Space Reserve contracts to six space domain awareness firms, including LeoLabs, Slingshot and Anduril, worth $1.37 million total, while shutter-control and indemnification terms remain unresolved.
-
Awards
SDA Books $1.75B for 36 Golden Dome Missile-Tracking Satellites With L3Harris, Sierra Space
The Space Development Agency awarded L3Harris $955M and Sierra Space $798M to build 36 Tranche 3 missile-tracking and missile-defense satellites for Golden Dome for America, bringing the Tracking Layer to 104 spacecraft with delivery expected by end of 2028.
-
Awards
Space Force Adds Impulse Space and Relativity Federal to $5.6B Lane 1 Launch Pool
Space Force awarded Impulse Space and Relativity Federal spots on the $5.6B NSSL Lane 1 launch IDIQ, adding an upper-stage-only prime and a reusable-rocket startup to a pool that now spans seven companies through FY2029.
-
Awards
SpaceX Wins $2.29B Space Force Contract to Build Starshield-Based Space Data Network Backbone
Space Systems Command awarded SpaceX a $2.29B Other Transaction Agreement to build the Space Data Network Backbone, a militarized Starshield LEO constellation delivering worldwide tactical communications and broadband, with a fully operational prototype required by end of 2027.
-
Awards
Odyssey Systems Gets $49M Space Force Space Domain Awareness Advisory Option Year 4
Odyssey Systems Consulting Group received a $48.9M contract modification on May 8 exercising Option Year Four of its Space Domain Awareness technical acquisition and advisory services contract with Space Systems Command, bringing the cumulative contract value to $202M. Work runs at Peterson Space Force Base through May 2027.
-
Awards
Anduril Lands $100M Space Force Contract Modification to Double SDANet Space Surveillance Mesh
Space Systems Command expanded Anduril's SDANet contract ceiling from $99.7M to $200M, funding the next phase of a Lattice-powered mesh network connecting Space Surveillance Network sensors worldwide.
-
Awards
Space Development Agency awards $3.5B for 72 missile-tracking satellites — Tranche 3 four-vendor split
Lockheed Martin, L3Harris, Rocket Lab, and Northrop Grumman each build 18 satellites for the Tracking Layer Tranche 3 constellation. Launches scheduled FY29. Lockheed leads at $1.1B; Rocket Lab's award is its largest defense win.