Blue Origin
Every GovConFeed story on Blue Origin — contract awards, policy, enforcement, and protests, newest first.
-
Awards
$985M NSSL Lane 2 Modifications Go to SpaceX, ULA and Blue Origin as Vulcan Failure Squeezes Launch Capacity
Space Systems Command awarded SpaceX, ULA and Blue Origin up to $985 million in NSSL Phase 3 Lane 2 contract modifications running to April 2033, a day after a Vulcan failure left Falcon 9 and Falcon Heavy as the only other rockets authorized for Lane 2 critical payloads.
-
Awards
Space Force Adds Impulse Space and Relativity Federal to $5.6B Lane 1 Launch Pool
Space Force awarded Impulse Space and Relativity Federal spots on the $5.6B NSSL Lane 1 launch IDIQ, adding an upper-stage-only prime and a reusable-rocket startup to a pool that now spans seven companies through FY2029.
-
Awards
NASA Awards Nearly $1 Billion Across Four Companies for Moon Base Rovers and Landers
NASA selected Astrolab, Lunar Outpost, Blue Origin, and Firefly Aerospace for at least $907.4 million in confirmed task order awards for rovers, landers, and a drone carrier supporting three Moon Base missions planned for 2026.
-
Awards
NASA Awards ~$1B in Moon Base Rover and Lander Contracts to Blue Origin, Astrolab, Lunar Outpost, and Firefly
NASA has awarded approximately $1 billion in contracts to four companies — Astrolab, Lunar Outpost, Blue Origin, and Firefly Aerospace — for lunar rovers, cargo landers, and drone spacecraft to support Moon Base I, targeting a fall 2026 or later launch and sustained human presence near the lunar South Pole.
-
Awards
Space Force FY26 launches: SpaceX gets 5 missions ($714M), ULA gets 2 ($428M)
Second-round FY2026 National Security Space Launch assignments under Phase 3 Lane 2 — SpaceX captures the majority, ULA wins GPS IIIF and a classified NRO payload. FY27-FY32 launch windows.