Leidos
Every GovConFeed story on Leidos — contract awards, policy, enforcement, and protests, newest first.
-
Awards
Marine Corps MRADR Air-Defense Radar Moves Toward Fielding With $40.8M Leidos Order for 14 Systems
Leidos subsidiary Dynetics will build 14 production-representative Medium Range Air Defense Radars for the Marine Corps under a $40.8M modification, moving the low-signature radar from prototype toward fielding, with work due by August 2028.
-
Awards
Pentagon FutureG Office Puts $50M+ Into 6G Sensing Prototypes as AT&T, Leidos, Nokia Federal, Peraton and IBM Join RAPID Teams
The Pentagon's FutureG Office is funding more than $50M for 11 teams to build integrated sensing and communications (ISAC) prototypes under NSC's RAPID program. AT&T, Leidos, Nokia Federal, Peraton Labs and IBM are on the teams, and about two-thirds of nearly 30 participants are small or nontraditional contractors.
-
Awards
$160M Cyber Command Task Order Puts Leidos Inside Full-Spectrum Cyber Operations
Leidos will help U.S. Cyber Command plan and conduct offensive and defensive cyber operations under a $160 million OASIS+ task order, a win the company tied to its 2025 Kudu Dynamics acquisition.
-
Awards
$317.9M Leidos Bridge Keeps MHS Genesis Running as DHA Drops Lead Integrator
DHA finalized a $317.9 million sole-source bridge with Leidos through January 2028 for MHS Genesis integration, licensing and hosting. Its scope shrinks as DHA moves to direct deals with Oracle, Philips, Amwell, Henry Schein and Solventum.
-
Awards
$672.5M TSA Checkpoint Equipment Deployment Recompete Stays With Leidos
TSA kept Leidos as sole deployer of airport checkpoint screening equipment under a single-award IDIQ worth up to $672.5M over eight years, up from the $470.7M 2021 contract. Three bids came in; Leidos had drawn $435M in orders on the predecessor.
-
Awards
NASA Splits $1.4B Enterprise Logistics Work Among 16 OASIS+ Holders
NASA selected 16 companies, seven of them Alaska Native or tribal subsidiaries, for $1.4 billion in Enterprise Logistics Support Services BPAs placed on GSA's OASIS+, covering property management, transportation, disposal, export control and flight hardware support for up to 8.5 years.
-
Awards
SOCOM Pushes Leidos' AGM-190A 'Black Arrow' Cruise Missile Into Production With $27.2M Award
USSOCOM awarded Leidos a $27.2M contract modification to produce All Up Rounds of the AGM-190A small cruise missile, moving the Huntsville-built 'Black Arrow' program from flight testing into low-rate production.
-
Awards
NASA Awards SEWP VI IT Contract Vehicle to 364 Firms Including AT&T, Booz Allen, IBM, and Leidos — $20B Ceiling per Category, 10-Year Ordering Period
NASA named 364 initial awardees for the Solutions for Enterprise-Wide Procurement (SEWP) VI contract vehicle on June 22, 2026, covering hardware, software, cloud, and cybersecurity across three categories with a $20 billion ceiling each and a 10-year ordering period through October 31, 2036.
-
Awards
Leidos Wins $270M CBP IDIQ to Deliver 100 Medium Energy Mobile Inspection Systems for Border Operations
Leidos wins a potential $270M single-award IDIQ from CBP to deliver up to 100 truck-mounted Medium Energy Mobile Systems for non-intrusive vehicle and cargo inspection at border crossings over five years.
-
Awards
Leidos Wins $2.7 Billion Army Contract to Produce Dark Eagle Hypersonic Missiles
Leidos landed a $2.7 billion FAR Part 15 contract from Army Contracting Command at Redstone Arsenal to consolidate and scale production of the Dark Eagle Long-Range Hypersonic Weapon, transitioning the program from OTA development into conventional acquisition.
-
Awards
Leidos Wins $475M Air Force Contract to Sustain F-16 Avionics Worldwide
Leidos secured a $475M contract from Hill Air Force Base to provide product support integration for the F-16 Avionics Intermediate Shop program, covering USAF and allied air forces globally.
-
Awards
Air Force to Begin FAMM Cruise Missile Production in September, Eyes 28,000 Units Over Five Years With Anduril and CoAspire
Air Force Chief of Staff Gen. Kenneth Wilsbach confirmed September 2026 production start for the Family of Affordable Mass Missiles, with FY2026 funding already covering the first 1,000 rounds and a five-year plan to procure nearly 28,000 weapons.