Lockheed Martin
Every GovConFeed story on Lockheed Martin — contract awards, policy, enforcement, and protests, newest first.
-
Awards
Lockheed Martin Awarded $61M to Develop PAC-3 MSE Containerized Launcher and RIG-360 System
Army Contracting Command – Redstone Arsenal awards Lockheed Martin a $61 million cost-plus-incentive-fee contract to develop and demonstrate the Missile Segment Enhancement Containerized Launcher and RIG-360 Integrated Assembly, including three flight test articles.
-
Awards
Lockheed Martin Wins $991M NAVAIR Contract for F-35 Electronic Warfare Modification Kits
NAVAIR awards Lockheed Martin a $991 million firm-fixed-price contract for 432 electronic warfare modification kits across Air Force, Marine Corps, Navy, and foreign military sales variants of the F-35 Joint Strike Fighter.
-
Policy
Northrop Grumman's $919M Triple Win on May 15: What Three Awards in One Day Signal
Northrop Grumman captured three major DoD awards totaling $919 million on May 15, 2026 — MQ-4C Triton logistics, Space Force SATCOM development, and RangeHawk hypersonic test infrastructure — reflecting the company's breadth across space, air, and advanced test domains.
-
Awards
Lockheed Martin Wins $212M Army Modification for PAC-3 Missile Logistics and Repair
The Army awarded Lockheed Martin a $212.7 million contract modification on May 12 for PATRIOT Advanced Capability-3 missile and launcher repair and logistics support, bringing the program's cumulative contract value to $875.6 million as PAC-3 demand surges globally.
-
Awards
Space Force Awards $3.2 Billion to 12 Companies to Prototype Golden Dome Space-Based Interceptors
Space Systems Command awarded 20 Other Transaction Authority contracts worth up to $3.2 billion to 12 companies — including SpaceX, Anduril, Lockheed Martin, and Northrop Grumman — to develop space-based interceptors for the Golden Dome missile defense architecture.
-
Awards
Lockheed Martin RMS Receives $75.6M Modification for Navy and Coast Guard Integrated Combat Systems
Lockheed Martin Rotary and Mission Systems picked up a $75.6M contract modification on May 8 for systems engineering and software integration supporting integrated combat systems across Navy and Coast Guard surface forces, with work split between Moorestown, NJ and Columbia, MD.
-
Awards
Lockheed Martin Wins $407M to Advance Aegis Guam Missile Defense to Combat-Ready Status
The Missile Defense Agency modified Lockheed Martin's Aegis Guam contract by $407M, pushing the total program value past $1.9B as the Pacific deterrent system moves toward engineering certification.
-
Awards
Navy Awards HII's Ingalls Shipbuilding $283M to Start FF(X) Frigate Construction After Constellation-Class Cancellation
Ingalls Shipbuilding secured a $283 million lead yard support contract on April 28 to begin cutting steel and procuring long-lead materials for the FF(X) frigate, which replaces the cancelled Constellation-class program and targets first delivery by 2028.
-
Awards
NAVAIR Awards Lockheed Martin $14.5M to Instrument F-35C Test Jets for Carrier Suitability Trials as Block 4 Testing Gap Widens
A $14.5M cost-plus-incentive-fee contract awarded to Lockheed Martin by Naval Air Systems Command covers installation of flight test instrumentation on CF-5 aircraft to bridge a gap in F-35C carrier suitability testing until dedicated flight science jets become available.
-
Awards
Space Force Triples Andromeda Ceiling to $6.2B — 14 Firms to Replace GSSAP and SILENTBARKER Spy Satellites
The Andromeda IDIQ, awarded to 14 firms in April 2026 for next-generation geosynchronous surveillance satellites, has seen its ceiling raised from $1.84B to $6.2B. The program replaces GSSAP (run by Space Force) and SILENTBARKER (run jointly with NRO). FY2027 urgency is driving the acceleration.
-
Awards
Raytheon books $441.6M PATRIOT GEM-T modification to replenish stocks consumed in Operation Epic Fury
Modification P00026 to W31P4Q-23-C-0036, awarded April 30 and announced May 1, 2026 — work runs through September 30, 2026 at the Chambersburg, PA plant. Fully funded with FY26 special funds.
-
Awards
AAR books $305M follow-on Navy/Marine Corps C-40A clipper sustainment contract
Long-running C-40A (Navy version of Boeing 737-700) maintenance, supply, and engineering support — extends AAR's incumbent position on the Navy's logistics-airlift fleet.