Lockheed Martin
Every GovConFeed story on Lockheed Martin — contract awards, policy, enforcement, and protests, newest first.
-
Awards
Lockheed Martin Wins $2.29 Billion Navy IDIQ for F-35 Global Sustainment
The U.S. Navy awarded Lockheed Martin a $2.293 billion cost-plus-incentive-fee IDIQ (contract N00019-26-D-0004) for F-35 Lightning II initial sustainment across all variants, covering Navy, Marine Corps, and allied partner aircraft through 2030.
-
Policy
SASC Advances $1.14T FY2027 NDAA With F-35, F-15EX Multiyear Contracts and Buyback Ban
The Senate Armed Services Committee voted 18-9 on June 11, 2026 to advance the FY2027 NDAA, authorizing multiyear procurement for F-35 and F-15EX aircraft and prohibiting DoD from allowing defense firms to buy back their own stock using contract profits.
-
Awards
Navy Awards $249.9M LIIS-CMDS Logistics IT Modernization IDIQ to 59 Firms
The Navy awarded the $249.9M LIIS-CMDS IDIQ to 59 of 72 offerors across two lots on June 11 to modernize logistics data integration and software capability for fleet readiness through 2031.
-
Awards
Boeing Withdraws From Navy UJTS Jet Trainer Competition, Leaving Textron and SNC in $2.7B T-45 Replacement Race
Boeing withdrew from the Navy's $2.7B UJTS competition in June 2026, citing engine qualification timelines for the T-7A Red Hawk. Textron Aviation Defense and SNC remain as the only two competitors to replace the T-45 Goshawk.
-
Policy
GAO: Fewer Than 1 in 4 F-35s Fully Mission Capable as Sustainment Costs Spiral $13.7B Over Budget
A new GAO report finds the F-35's full mission capable rate collapsed from 38.1% in FY2021 to 24.6% in FY2025. The Pentagon's revised sustainment strategy will cost $13.7 billion more than planned through FY2031, with annual costs breaching service affordability targets by the mid-2030s.
-
Policy
Navy Raises T-45 Replacement Price Ceiling to $2.7B, Nearly $1 Billion Above Original Cap, as Proposals Near Deadline
NAVAIR lifted the UJTS trainer jet price ceiling from $1.75B to $2.7B — a $950M jump — citing a revised program cost estimate. Three teams remain in competition ahead of the June 29 proposal deadline, with contract award targeted for early 2027.
-
Policy
House Passes Iran War Powers Resolution 215–208, Contractors Monitor Budget and Demand Implications
The House voted 215–208 on June 3 to require withdrawal of U.S. forces from Iran operations within 30 days. The resolution faces a Senate filibuster and near-certain veto, but its passage signals congressional unease with prolonged conflict — with real budget and demand consequences for defense contractors.
-
Awards
Lockheed Martin Wins $200.8M Navy Contract for AEGIS Training Support Across Six Foreign Military Sales Partners
Lockheed Martin's Orlando-based Rotary and Mission Systems unit won a $200,823,547 Navy contract to provide AEGIS combat-system training support to six Foreign Military Sales partners — Australia, Canada, Japan, Norway, South Korea, and Spain — through June 2031.
-
Awards
Lockheed Martin Wins $100.5M Order for 1,459 F-35 Brake Heat Sinks to Resolve Fleet Thermal Constraint
Lockheed Martin Aeronautics received a $100,455,916 firm-fixed-price order (N0001926F0266) from Naval Air Systems Command for 1,459 F-35 brake assembly heat sinks -- 1,075 for the F-35A and 384 for the F-35B -- to resolve a thermal management constraint. Work is in South Bend, Indiana, through March 2030.
-
Policy
House Armed Services Committee Releases $1.15 Trillion FY2027 NDAA Chairman's Mark, Markup Set for June 4
The House Armed Services Committee released its $1.15 trillion FY2027 NDAA chairman's mark on May 26, 2026, authorizing multiyear procurements for F-35s, destroyers, and amphibious vessels while requiring a second solid rocket motor manufacturer.
-
Awards
Lockheed Martin Wins $54M NAVAIR Order for MH-60 Seahawk System Configuration 28 Fleet-Wide Release
NAVAIR awarded Lockheed Martin's Rotary and Mission Systems division a $54.1 million order to engineer, test, and deploy System Configuration 28 — the next major avionics and software baseline across the entire MH-60 Seahawk fleet — covering Navy and allied foreign military sales variants through October 2028.
-
Awards
Lockheed Martin Wins $879M F-35 Armament Contract for Lots 18 and 19
The Pentagon awarded Lockheed Martin a $879 million modification for F-35 armament integration covering production Lots 18 and 19, continuing the program's decade-long weapons modernization track.