Lockheed Martin
Every GovConFeed story on Lockheed Martin — contract awards, policy, enforcement, and protests, newest first.
-
Awards
Lockheed Martin books $27.5M Space Fence modification — keeps the LEO-tracking radar operational
May 1, 2026 modification on AN/FSY-3 — the Kwajalein-based S-band radar that detects, tracks, and catalogs space objects for the Space Force's space situational awareness mission.
-
Awards
Space Force awards $1.84B Andromeda IDIQ to 14 firms — RG-XX recon constellation kicks off
April 8, 2026 announcement: SSC selects 14 companies from 32 proposals for the $1.84B, 10-year Andromeda IDIQ. First task order funds Geosynchronous Reconnaissance & Surveillance Constellation (RG-XX), replacing GSSAP.
-
Awards
Lockheed Martin's F-35 Lots 18-19 — $12.5B contract finalizes 296 fighters at $24.3B total
DoD modification finalizes Lots 18 and 19 of F-35 production. 296 jets, $24.3B combined value, deliveries through August 2028. Plus a separate April 2026 $177.5M test-aircraft contract.
-
Awards
RTX's Pratt & Whitney lands $6.6B F135 engine contract — definitizing the same Lots 18-19
Pratt & Whitney's F135 propulsion contract modification (March 31, 2026) supports F-35 Lots 18 and 19 across CTOL, CV, and STOVL variants. Program supports 66,000 jobs across 47 states.
-
Awards
Space Development Agency awards $3.5B for 72 missile-tracking satellites — Tranche 3 four-vendor split
Lockheed Martin, L3Harris, Rocket Lab, and Northrop Grumman each build 18 satellites for the Tracking Layer Tranche 3 constellation. Launches scheduled FY29. Lockheed leads at $1.1B; Rocket Lab's award is its largest defense win.
-
Awards
Space Force awards Lockheed Martin $1.2B GPS III satellite sustainment contract
The U.S. Space Force has awarded Lockheed Martin a $1.2 billion contract to sustain the GPS III satellite constellation through 2031, covering on-orbit operations support, anomaly resolution, and ground system integration for the ten GPS III satellites currently in service.
-
Awards
Raytheon signs $3.7B GEM-T deal — German-funded Patriot interceptors for Ukraine
Signed April 14, the contract commits $3.7 billion to Patriot Advanced Capability-2 GEM-T interceptor production at a new Schrobenhausen, Germany facility. Direct commercial sale, financed by Germany. Plant operational in 2026, missiles delivered around 2028.
-
Awards
Artemis II flew April 1 — NASA's 2,700-supplier chain just passed its biggest test
The crewed lunar fly-by validated a procurement model spanning 47 states and 11 prime contractors. With Artemis III hardware now ramping, the small-business supply pipeline is opening.
-
Awards
Lockheed Martin lands $4.76B PAC-3 contract — but 94% of the money is foreign
An undefinitized contract action signed April 10 obligates $4.76B for Patriot interceptor production through 2030. Only $265M of it is U.S. Army money. The deal is a window into how Foreign Military Sales now drive missile-line throughput.