Northrop Grumman
Every GovConFeed story on Northrop Grumman — contract awards, policy, enforcement, and protests, newest first.
-
Awards
Northrop Grumman Awarded $398M Sole-Source OTA for Space Force SATCOM Development
Space Systems Command awards Northrop Grumman a $398 million firm-fixed-price contract for space vehicle development, launch, and on-orbit support for a classified SATCOM program, using sole-source authority under 10 U.S.C. § 4022.
-
Awards
Northrop Grumman Gets $196M NAVAIR Contract for MQ-4C Triton Logistics and ISR Support
NAVAIR awards Northrop Grumman a $196 million cost-plus-fixed-fee modification to provide logistics, field support, and intelligence reach-back services for the MQ-4C Triton maritime surveillance drone through May 2027.
-
Awards
Conti Federal Wins $36.3M Contract to Build B-21 Raider Flight Simulator Facility at Ellsworth AFB
Conti Federal Services won a $36.3 million design-bid-build contract to construct the B-21 Raider ADD Flight Simulator Phase 2 facility at Ellsworth Air Force Base, South Dakota, with completion scheduled for July 2028.
-
Awards
Space Force Awards $3.2 Billion to 12 Companies to Prototype Golden Dome Space-Based Interceptors
Space Systems Command awarded 20 Other Transaction Authority contracts worth up to $3.2 billion to 12 companies — including SpaceX, Anduril, Lockheed Martin, and Northrop Grumman — to develop space-based interceptors for the Golden Dome missile defense architecture.
-
Awards
Northrop Grumman Wins $100M Sole-Source Air Force Contract for Stand-in Attack Weapon Seeker Components
Northrop Grumman secured a sole-source Air Force contract worth up to $100M for active seeker components, test and evaluation support, and science and technology development for the Stand-in Attack Weapon (SiAW) — an F-35A-compatible air-to-surface missile targeting enemy air defenses — with performance through December 2034.
-
Awards
DMEA Awards $25.4B ATSP V Microelectronics IDIQ to 10 Companies Led by Northrop, Raytheon, Leidos
The Defense Microelectronics Activity awarded 10 companies — including Northrop Grumman, Raytheon, Leidos, L3Harris, Boeing, and Draper Lab — spots on the $25.4B ATSP V IDIQ contract to accelerate American-made microelectronics into military systems over a potential 10-year ordering period.
-
Awards
Lockheed Martin Wins $407M to Advance Aegis Guam Missile Defense to Combat-Ready Status
The Missile Defense Agency modified Lockheed Martin's Aegis Guam contract by $407M, pushing the total program value past $1.9B as the Pacific deterrent system moves toward engineering certification.
-
Awards
Space Force Triples Andromeda Ceiling to $6.2B — 14 Firms to Replace GSSAP and SILENTBARKER Spy Satellites
The Andromeda IDIQ, awarded to 14 firms in April 2026 for next-generation geosynchronous surveillance satellites, has seen its ceiling raised from $1.84B to $6.2B. The program replaces GSSAP (run by Space Force) and SILENTBARKER (run jointly with NRO). FY2027 urgency is driving the acceleration.
-
Awards
Space Force awards $1.84B Andromeda IDIQ to 14 firms — RG-XX recon constellation kicks off
April 8, 2026 announcement: SSC selects 14 companies from 32 proposals for the $1.84B, 10-year Andromeda IDIQ. First task order funds Geosynchronous Reconnaissance & Surveillance Constellation (RG-XX), replacing GSSAP.
-
Awards
Kratos books $446.8M Space Force OTA for MEO Missile Warning & Tracking ground segment
March 17, 2026 follow-on Ground Management Integration OTA from Space Systems Command. Kratos leads team including Northrop Grumman, Auria, ASRC Federal Systems Solutions, Rise8. Supports Epoch 1 (12 Millennium sats) and Epoch 2 (10 BAE sats).
-
Awards
GSA names 43 Phase 1 Alliant 3 awardees — no maximum dollar ceiling on the GWAC
February 23, 2026 announcement: 43 phase-1 winners from 133 proposals. Total target ~76 awardees across multiple phases. No maximum dollar ceiling. Vehicle covers cloud, cyber, data, software, systems engineering, emerging tech.
-
Awards
Space Development Agency awards $3.5B for 72 missile-tracking satellites — Tranche 3 four-vendor split
Lockheed Martin, L3Harris, Rocket Lab, and Northrop Grumman each build 18 satellites for the Tracking Layer Tranche 3 constellation. Launches scheduled FY29. Lockheed leads at $1.1B; Rocket Lab's award is its largest defense win.