Rolls-Royce
Every GovConFeed story on Rolls-Royce — contract awards, policy, enforcement, and protests, newest first.
-
Awards
Navy Orders 10 More CMV-22B Osprey Engines in $36.5M Rolls-Royce Deal
NAVAIR awarded Rolls-Royce a $36.5 million sole-source contract on July 13, 2026, for 10 AE 1107C Lot 28 turboshaft engines powering the Navy CMV-22B Osprey, with completion due May 2028.
-
Awards
Air Force Awards GE Aerospace, Rolls-Royce OTA Contracts for Medium Thrust Class Drone Engine Designs
The U.S. Air Force awarded OTA contracts to GE Aerospace and Rolls-Royce to develop engines for the Medium Thrust Class Autonomous Collaborative Platform, placing AI-piloted drone propulsion in preliminary design review under Propulsion Consortium Initiative 2.0.
-
Awards
B-52J Clears Critical Design Review — Boeing Begins $2B Engine Swap at San Antonio This Year
The B-52 Commercial Engine Replacement Program passed its Critical Design Review in early May 2026, clearing the path for Boeing to begin modifying the first two aircraft at its San Antonio facility later this year. Rolls-Royce F130 engines will replace 1960s-era TF33s on all 76 bombers.