RTX (Raytheon)
Every GovConFeed story on RTX (Raytheon) — contract awards, policy, enforcement, and protests, newest first.
-
Enforcement
B-52 Crash at Edwards Kills 8—Including Two Boeing Employees—During AN/APQ-188 Radar Test
A B-52H crashed June 15, 2026 at Edwards AFB, killing all eight aboard—including two Boeing employees—during an AN/APQ-188 AESA radar test. The aircraft was the first in the fleet to receive the upgrade under the B-52J modernization program, which had already slipped three years.
-
Policy
Pentagon Asks Congress to Gut McCain-Era Revolving Door Rules for Mid-Grade Officials in FY2027 NDAA
The Pentagon submitted a FY2027 NDAA proposal in June 2026 to eliminate one-year post-service lobbying cooling-off periods for O-7/O-8 officers and narrow all remaining restrictions to only the specific department office where former officials served.
-
Awards
Army Issues RFI for 11,000 Next-Generation Stinger-Replacement Missiles, Eyes FY28 Production Start
The U.S. Army's Maneuver Short Range Air Defense program issued a Request for Information on June 5, 2026, seeking contractors capable of delivering 11,000 Next Generation Short Range Interceptor missiles and 2,200 Control Launch Assemblies over a 10-year production run beginning in FY28. Industry responses are due July 6, 2026.
-
Policy
Kim Orders 10,000-Ton Destroyer as North Korea Naval Buildup Reshapes U.S. Missile Defense Procurement
Kim Jong Un ordered North Korea's navy to develop a 10,000-ton guided-missile destroyer during sea trials of the Kang Kon on June 6, 2026. CSIS analysts warn the buildup could complicate U.S. missile defense — with direct implications for naval interceptor and radar contractors.
-
Policy
House Passes Iran War Powers Resolution 215–208, Contractors Monitor Budget and Demand Implications
The House voted 215–208 on June 3 to require withdrawal of U.S. forces from Iran operations within 30 days. The resolution faces a Senate filibuster and near-certain veto, but its passage signals congressional unease with prolonged conflict — with real budget and demand consequences for defense contractors.
-
Awards
Raytheon Wins $515M Navy Contract Modification to Expand SPY-6 Radar Production and Upgrades
Naval Sea Systems Command awarded Raytheon Missiles and Defense a $515,822,691 modification to its SPY-6 family of radars Integration and Production Support contract, covering Flight IIA destroyer upgrades, Foreign Military Sales to Germany, and domestic production across eleven U.S. sites through May 2027.
-
Awards
Army Awards Raytheon $1.02B Single-Bid Contract for NASAMS Air Defense Fire Units Under Kuwait Foreign Military Sales
The Army awarded Raytheon Co. a $1.02 billion firm-fixed-price single-bid contract for NASAMS air defense fire units under a Kuwait Foreign Military Sales case. The full amount was obligated at award. Work is set for completion by May 2031, with the contract managed out of Army Contracting Command, Redstone Arsenal.
-
Awards
NASA Releases Draft RFP for Landsat 10 Spacecraft With 2031 Launch Target and Full-and-Open Competition
NASA Goddard has released a draft RFP for the Landsat 10 spacecraft bus, targeting a 2031 launch with a ~5.5-year performance period. The full-and-open competition uses FFP and T&M contract types, with presolicitation responses due June 2, 2026.
-
Policy
Army's FY2027 Budget Requests $994M for Counter-Drone Systems — a 195% Surge — With Raytheon, AeroVironment, and Anduril in the Mix
The Army's FY2027 budget requests $994M for counter-small unmanned aircraft systems, a 195% jump from $336M in FY2026, with investments spanning Raytheon's Coyote interceptors, AeroVironment's Freedom Eagle, and Anduril's Anvil autonomous platform.
-
Awards
Space Force Awards $3.2 Billion to 12 Companies to Prototype Golden Dome Space-Based Interceptors
Space Systems Command awarded 20 Other Transaction Authority contracts worth up to $3.2 billion to 12 companies — including SpaceX, Anduril, Lockheed Martin, and Northrop Grumman — to develop space-based interceptors for the Golden Dome missile defense architecture.
-
Awards
DMEA Awards $25.4B ATSP V Microelectronics IDIQ to 10 Companies Led by Northrop, Raytheon, Leidos
The Defense Microelectronics Activity awarded 10 companies — including Northrop Grumman, Raytheon, Leidos, L3Harris, Boeing, and Draper Lab — spots on the $25.4B ATSP V IDIQ contract to accelerate American-made microelectronics into military systems over a potential 10-year ordering period.
-
Policy
Raytheon and Nightwing Pay $8.4M to Settle False Claims Act Allegations Over Cybersecurity Failures on DoD Contracts
Raytheon, RTX, and the Nightwing successor entity settled DOJ False Claims Act claims over NIST SP 800-171 non-compliance on unclassified DoD contracts, paying $8.4M in the latest Civil Cyber Fraud Initiative action — with the whistleblower walking away with $1.5M.