RTX (Raytheon)
Every GovConFeed story on RTX (Raytheon) — contract awards, policy, enforcement, and protests, newest first.
-
Awards
Space Force Missile-Warning Radar Digitization Goes to Raytheon After $309.5M Prototype Deal
Raytheon says the Space Force selected it to digitize missile-warning radar back ends under GBRD. The value traces to July prototype agreements: $309.5M for Raytheon of a $423.4M total shared with SciTec and WildStar, with $783M in the FYDP.
-
Awards
$729M LIDS Counter-Drone Awards Bring First Coyote and KuRFS Export Sales to Qatar and Jordan
Raytheon booked $729 million in LIDS counter-drone awards for the U.S. Army, Qatar and Jordan, the first international sales of its KuRFS radar and Coyote interceptor. The company did not disclose quantities, delivery schedules or how the money splits among the three customers.
-
Awards
$6.3B SM-3 Block IB Deal Sets Up Multiyear Interceptor Restock at Raytheon
The Missile Defense Agency awarded Raytheon an undefinitized SM-3 Block IB contract with a $4.4 billion base and a ceiling of up to $6.3 billion, aimed at replenishing interceptors used in combat. Production runs mainly in Tucson and Huntsville.
-
Policy
Section 815 Buyback Limits Split Unions and Chamber as NDAA Heads to Conference
Labor unions want the Senate NDAA's Section 815 kept in the final bill; the U.S. Chamber wants it cut. The provision would bar Pentagon contracts with firms paying buybacks or dividends absent a waiver. The House bill has no such language.
-
Awards
Navy's $24.4B SM-6 Multiyear Deal Locks In Raytheon Interceptor Supply Before Congress Funds It
The Navy awarded Raytheon a five-year, up-to-$24.4B contract with two option years for SM-6 interceptors. Quantities and delivery schedules are unspecified, and industry executives say Congress has not yet appropriated the money.
-
Awards
Navy Gives Collins Aerospace a Non-Competed $249.7M Contract for GPS Range Instrumentation Through 2031
The Navy awarded Collins Aerospace a $249.7M sole-source IDIQ for GPS-based range instrumentation test and training systems, covering CRIIS, TCTS II, AARI 2G and P6 upgrades. No funds were obligated at award; work runs to September 2031.
-
Awards
$20.7B Sole-Source AMRAAM Multiyear Deal Puts Raytheon on Record Production Path for 16 Foreign Customers
The Air Force gave Raytheon a sole-source, not-to-exceed $20.7 billion undefinitized multiyear AMRAAM contract covering foreign military sales to 16 countries, with only about $154 million obligated at award and work running to June 2033.
-
Awards
Federal Contract Spending Is Up 22.5% Through May. Nearly a Third of the Increase Is at Homeland Security.
A GovConFeed analysis of USAspending.gov records finds agencies obligated $520.9 billion on contracts from October through May, $95.8 billion more than in the same eight months a year earlier. Customs and Border Protection went from $1.9 billion to $25.7 billion.
-
Enforcement
Raytheon's GPS Ground System Cancelled as Space Force Satellite Overruns Hit $11.4B
GAO's July 2026 Weapon Systems Assessment finds $11.4 billion in cost overruns across Space Force satellite programs and confirms the Pentagon quietly cancelled Raytheon's OCX ground-control system for GPS after years of software delays and cost growth.
-
Awards
$1.1 Billion AIM-9X Lot 26 Order Becomes the Largest Sidewinder Buy on Record
The U.S. Navy exercised Lot 26 production options worth $1.108 billion with Raytheon for 1,989 AIM-9X Block II and Block II+ tactical missiles, the largest single Sidewinder order to date, with work running through 2029.
-
Awards
Navy Delivers Two Modernized Arleigh Burke Destroyers Ahead of Schedule Under DDG MOD 2.0
The Navy accepted USS Chung-Hoon (DDG 93) and USS James E. Williams (DDG 95) after completing DDG Modernization 2.0 depot periods ahead of schedule, fielding Northrop Grumman's SLQ-32(V)7 SEWIP Block 3 electronic warfare suite on both ships.
-
Awards
Air Force Opens $399M AMRAAM D4/C9 Development for 31 Allied Nations
Air Force Life Cycle Management Center awarded Raytheon a $398.7M undefinitized contract action on June 23, 2026, to begin AMRAAM D4/C9 variant development, covering system requirements and preliminary design reviews for a 31-nation foreign military sales program with $104.1M obligated at award.