U.S. Army
Every GovConFeed story on U.S. Army — contract awards, policy, enforcement, and protests, newest first.
-
Awards
Army Corps Awards Hewlett Packard Enterprise $28M for a New Supercomputer, Sustained Through 2035
The U.S. Army Corps of Engineers awarded Hewlett Packard Enterprise a $28M firm-fixed-price contract on June 24, 2026 to produce, deliver, install and maintain a high-performance computing system, lifting the contract's cumulative value to $43.6M with completion set for March 2035.
-
Awards
$8.4B Army Modification Expands Precision Strike Missile Production Through FY2032
Army Contracting Command awarded Lockheed Martin an $8.4 billion modification on June 23, 2026 to expand Precision Strike Missile production, lifting the contract ceiling to roughly $13.3 billion and extending the ordering period through fiscal 2032.
-
Awards
Army Selects Anduril and Palantir to Lead NGC2 Common Data Layer, Moving Command-and-Control Modernization From Prototype to Production
The Army announced Anduril Industries as lead for the Next Generation Command and Control common data layer baseline, partnering with Palantir and Raft to provide an edge-to-cloud data mesh that will scale to all 11 Army divisions over five years.
-
Awards
$396M Army Maintenance Trainer IDIQ Goes to TRU Simulation, Covering AI, XR, and Cybersecurity
Army Contracting Command Orlando awarded TRU Simulation + Training a $396M firm-fixed-price IDIQ on June 23, 2026 for the Family of Maintenance Trainers product line, covering AI, extended reality, and cloud-based training through 2033.
-
Awards
Army Orders Up to 5,000 LOCODA RAT Vehicle Communications Platforms From Thales After Four-Month Development Sprint
Thales Defense & Security secured a U.S. Army order for up to 5,000 LOCODA Radio Adaptable Transport platforms, a vehicle communications system developed and fielded in under four months. The system adds AES-256 encryption and MANET waveforms to existing radio mounts without new hardware installs.
-
Awards
$200M Tobyhanna Army Depot MRC Contract Goes to Structural Engineering Group
Army Contracting Command awarded Structural Engineering Group Inc. a $200 million five-year IDIQ on June 23, 2026 for maintenance, repair, and construction at Tobyhanna Army Depot, DoD's largest C5ISR electronics maintenance facility.
-
Awards
$860M DLA Sole-Source IDIQ Goes to Small Business for Army Engine Fuel Tanks
Defense Logistics Agency Weapons Support awarded Integrated Procurement Technologies a $860.7M sole-source IDIQ for Army engine fuel tanks, justified under FAR 6.302-1 as the only responsible source for the required components.
-
Awards
Lockheed Martin All-Up Rounds Contract Grows $83M to Stockpile Army Hypersonic Conventional Prompt Strike Missiles
Strategic Systems Programs awarded Lockheed Martin Space an $83.18M cost-plus-incentive-fee modification on June 22, 2026, to produce Common Hypersonic All-Up Rounds for U.S. Army stockpile, with work across seven U.S. sites and completion by June 2029.
-
Awards
L3Harris and Turkey's Skydagger Sign Co-Production Pact to Build FPV Drone Interceptors in the U.S. for Integration Into VAMPIRE Counter-Drone System
L3Harris Technologies and Turkish firm Skydagger signed a June 16 MOU to co-produce first-person-view drone interceptors in the U.S. for integration into L3Harris's VAMPIRE counter-UAS platform, with integration targeted by end of 2026.
-
Awards
Army Awards Rune Technologies $99M IDIQ for TyrOS Logistics Platform — One Bid Received
Army Contracting Command awarded Rune Technologies Inc. a $99M five-year IDIQ (W9128Z-26-D-A002) on June 16, 2026 for the TyrOS logistical operations software platform. A single bid was received; the vehicle runs through June 2031.
-
Awards
Army Awards 19 Firms $396M IDIQ to Rebuild Soldier Maintenance Training Across Weapons Systems Through 2033
Army Contracting Command Orlando selected 19 companies from 24 bidders for a $396M IDIQ to design, develop, produce, and sustain maintenance trainers for multiple Army weapons platforms through June 2033.
-
Awards
Army Expands Alloy Surfaces' Sole-Source Decoy Flare Contract by $300M to $328.8M Total Amid Rising Infrared Missile Threats
The Army added $300 million to Alloy Surfaces Company's sole-source contract for infrared decoy flares, bringing the total to $328.8 million and extending production through March 2031 as drone-launched heat-seeking missiles intensify aircraft survivability demand.