U.S. Marine Corps
Every GovConFeed story on U.S. Marine Corps — contract awards, policy, enforcement, and protests, newest first.
-
Awards
NIWC Pacific Awards $178M Cybersecurity and Systems Lifecycle IDIQ to Ten Small Businesses
Naval Information Warfare Center Pacific has awarded a $178.4M small-business IDIQ to ten firms, including Dark Wolf Solutions, for cybersecurity, command and control integration, and systems lifecycle support across Navy and Marine Corps programs.
-
Awards
Lockheed Martin Wins $2.29 Billion Navy IDIQ for F-35 Global Sustainment
The U.S. Navy awarded Lockheed Martin a $2.293 billion cost-plus-incentive-fee IDIQ (contract N00019-26-D-0004) for F-35 Lightning II initial sustainment across all variants, covering Navy, Marine Corps, and allied partner aircraft through 2030.
-
Policy
GAO: Fewer Than 1 in 4 F-35s Fully Mission Capable as Sustainment Costs Spiral $13.7B Over Budget
A new GAO report finds the F-35's full mission capable rate collapsed from 38.1% in FY2021 to 24.6% in FY2025. The Pentagon's revised sustainment strategy will cost $13.7 billion more than planned through FY2031, with annual costs breaching service affordability targets by the mid-2030s.
-
Awards
Marines Eye Second JLTV Supplier as Oshkosh Alleges 20-Month AM General Delivery Gap
The Marine Corps closed an RFI June 10 exploring a second JLTV supplier, with Oshkosh Defense publicly alleging a 20- to 24-month delivery gap from current vendor AM General. The Marines are replacing their entire Humvee fleet with the JLTV.
-
Awards
Army Awards $212M Dual-Vendor Mortar Tail Fin Contract to Two Small Businesses
Army Contracting Command split a $212M firm-fixed-price contract for 60mm, 81mm, and 120mm mortar tail fins between Machining Technologies Inc. and Globe Tech LLC, using a dual-vendor structure that will compete individual orders between the two small businesses through June 2031.
-
Awards
Oshkosh Defense Wins $92M Marine Corps ROGUE-Fires Block 2 Autonomous Fires Contract
Marine Corps Systems Command awarded Oshkosh Defense LLC $92,079,801 across two May 29 delivery orders for ROGUE-Fires Block 2, the U.S. military's first semi-autonomous ground fires system, integrating Forterra AutoDrive for GPS-denied operations through September 2028.
-
Awards
Polaris Wins $98.3M Marine Corps Follow-On for Ultra-Light Tactical Vehicle With New High-Power Variant
The Marine Corps sole-sourced a $98.3 million follow-on contract to Polaris Government and Defense on May 22 for MRZR Alpha Ultra-Light Tactical Vehicles, adding a new High Power variant that delivers 5 kilowatts of exportable power for hosted electronics and field systems.
-
Awards
Northrop Grumman Wins $697M Marine Corps Radar Sustainment Agreement for G/ATOR Portfolio
Marine Corps Systems Command awarded Northrop Grumman a $697 million basic ordering agreement for sustainment engineering and logistics of the Ground/Air Task Oriented Radar system and related expeditionary radar programs through 2031.
-
Awards
Moog Military Aircraft Wins $25.9M Long-Term Navy Contract to Repair V-22 Osprey Bladefold Actuators
Moog Military Aircraft secured a $25.9 million long-term Navy contract to repair bladefold actuator components and power modules for the V-22 Osprey fleet, with work performed at its Torrance, California facility through May 2029.
-
Awards
Viasat's Inmarsat Government Unit Locks Up $307M Marine Corps Satellite Communications Recompete
Space Systems Command awarded Inmarsat Government a $307M firm-fixed-price contract for Marine Corps global satellite connectivity — the only proposal received in the recompete.
-
Awards
Army Awards $49M NCODE Contract to Eight Firms in Bid to Shield Small Defense Suppliers From Cyberattacks
Eight small businesses won spots on the Army's five-year NCODE contract to provide CMMC and NIST SP 800-171 compliance support to DIB small businesses through a managed secure cloud enclave, beating out 31 competing proposals.
-
Awards
AAR books $305M follow-on Navy/Marine Corps C-40A clipper sustainment contract
Long-running C-40A (Navy version of Boeing 737-700) maintenance, supply, and engineering support — extends AAR's incumbent position on the Navy's logistics-airlift fleet.