Marine Corps MRADR Air-Defense Radar Moves Toward Fielding With $40.8M Leidos Order for 14 Systems
Leidos subsidiary Dynetics will build 14 production-representative Medium Range Air Defense Radars for the Marine Corps under a $40.8M modification, moving the low-signature radar from prototype toward fielding, with work due by August 2028.
Read the story →