Missile Defense Agency
Every GovConFeed story on Missile Defense Agency — contract awards, policy, enforcement, and protests, newest first.
-
Awards
$6.3B SM-3 Block IB Deal Sets Up Multiyear Interceptor Restock at Raytheon
The Missile Defense Agency awarded Raytheon an undefinitized SM-3 Block IB contract with a $4.4 billion base and a ceiling of up to $6.3 billion, aimed at replenishing interceptors used in combat. Production runs mainly in Tucson and Huntsville.
-
Awards
$82.4M MDA Acquisition Support Contract Goes to Veteran-Owned Hive Group
The Missile Defense Agency awarded McLean, Virginia-based Hive Group a competitive cost-plus-fixed-fee contract worth up to $82.4 million for acquisition and contracting support across five sites, beating four other OASIS+ Small Business offerors.
-
Awards
MDA Books $499.6M Aeromet Deal to Keep Sensor Aircraft Watching Interceptor Tests
The Missile Defense Agency awarded L3Harris subsidiary Aeromet a 10-year, $499.6M IDIQ to operate, sustain and modernize the airborne sensor aircraft that track missile-defense interceptor flight tests, nearly tripling the ceiling of its 2021 predecessor contract.
-
Awards
Pentagon Locks In $35.3B Seven-Year THAAD Deal to Quadruple Interceptor Production Through FY2032
The Missile Defense Agency awarded Lockheed Martin a $35.3B seven-year undefinitized contract to quadruple THAAD interceptor production from 96 to 400 per year through FY2032, the first major multiyear procurement under the Department of War's Acquisition Transformation Strategy.
-
Awards
Lockheed Martin Wins $407M to Advance Aegis Guam Missile Defense to Combat-Ready Status
The Missile Defense Agency modified Lockheed Martin's Aegis Guam contract by $407M, pushing the total program value past $1.9B as the Pacific deterrent system moves toward engineering certification.
-
Awards
Raytheon books $966.7M MDA modifications for AN/TPY-2 radar — R&D + GaN spares ramp through 2030
Two MDA modifications totaling $966.7M for AN/TPY-2: $773.5M noncompetitive R&D modification plus $193.2M hybrid spares replenishment task order. Performance March 27, 2026 through Oct. 31, 2030.
-
Awards
MDA raises RTX SM-3 missile contract ceiling to $11.74B — $8.41B increase signals long sustainment tail
March 18, 2026 modification raises the SM-3 sustainment IDIQ ceiling from $3.33B to $11.74B. Period through October 29, 2029. Tucson + Huntsville performance. Contract progression: $722.4M (2020) → $3.33B (2025) → $11.74B (2026).