U.S. Navy
Every GovConFeed story on U.S. Navy — contract awards, policy, enforcement, and protests, newest first.
-
Awards
WSP Solutions Wins $249M NAVFAC Northwest Marine Waterfront A&E Contract
Naval Facilities Engineering Systems Command Northwest awarded WSP Solutions a $249 million IDIQ contract for marine waterfront architect and engineering services across the Pacific Northwest naval installation complex.
-
Awards
Central Maine Power Wins $44M NAVFAC Contract for Portsmouth Naval Shipyard Energy Infrastructure
NAVFAC Mid-Atlantic awards Central Maine Power a $44 million firm-fixed-price contract to upgrade substations, power distribution systems, metering, and energy services at Portsmouth Naval Shipyard in Kittery, Maine, with a decade-long completion window through 2036.
-
Awards
Young & Rubicam Navy Recruiting Ad Contract Grows to $663M Following New NAVSSC Modification
Naval Sea Systems Command awards Young & Rubicam a $84 million modification that raises the ceiling on the Navy's recruiting advertising IDIQ contract to $663.9 million, covering national media, digital, and recruitment marketing campaigns through the contract's ordering period.
-
Awards
Northrop Grumman Gets $196M NAVAIR Contract for MQ-4C Triton Logistics and ISR Support
NAVAIR awards Northrop Grumman a $196 million cost-plus-fixed-fee modification to provide logistics, field support, and intelligence reach-back services for the MQ-4C Triton maritime surveillance drone through May 2027.
-
Awards
Lockheed Martin Wins $991M NAVAIR Contract for F-35 Electronic Warfare Modification Kits
NAVAIR awards Lockheed Martin a $991 million firm-fixed-price contract for 432 electronic warfare modification kits across Air Force, Marine Corps, Navy, and foreign military sales variants of the F-35 Joint Strike Fighter.
-
Policy
Northrop Grumman's $919M Triple Win on May 15: What Three Awards in One Day Signal
Northrop Grumman captured three major DoD awards totaling $919 million on May 15, 2026 — MQ-4C Triton logistics, Space Force SATCOM development, and RangeHawk hypersonic test infrastructure — reflecting the company's breadth across space, air, and advanced test domains.
-
Awards
COLSA Corp Wins $59M Navy IDIQ for Data Link Tactical Tool and Gateway Systems Engineering
NIWC Pacific awards COLSA Corporation a $59 million cost-plus-fixed-fee IDIQ for engineering services supporting the Navy's data link tactical tool, gateway systems, and mini-rack systems, spanning sites in San Diego and Huntsville through May 2031.
-
Awards
National Industries for the Blind Wins $44M Navy Mattress IDIQ Under AbilityOne Program
DLA Troop Support awards National Industries for the Blind a $44.8 million firm-fixed-price IDIQ for innerspring mattresses for the Navy, sourced through the AbilityOne mandatory source program that requires federal agencies to purchase covered products from nonprofits employing people who are blind or have other significant disabilities.
-
Awards
Ocean Ships Wins $1.1B Navy Contract to Operate Seven Oceanographic Survey Vessels
Military Sealift Command awarded Houston-based Ocean Ships a $1.1 billion firm-fixed-price contract to operate and maintain seven T-AGS oceanographic survey ships through 2032, structured as a total small business set-aside that drew three competing proposals.
-
Awards
SEACORP Wins $32M SBIR Phase III Contract to Develop Submarine Payload Control System Technology
SEACORP LLC received a $31.9 million SBIR Phase III sole-source contract from the Naval Undersea Warfare Center to develop payload control system technology for Navy submarines, with work spanning Rhode Island, multiple U.S. locations, and sites in the United Kingdom and Australia.
-
Awards
Moog Military Aircraft Wins $25.9M Long-Term Navy Contract to Repair V-22 Osprey Bladefold Actuators
Moog Military Aircraft secured a $25.9 million long-term Navy contract to repair bladefold actuator components and power modules for the V-22 Osprey fleet, with work performed at its Torrance, California facility through May 2029.
-
Awards
Tyto Athene Wins $40M Fleet Cyber Command Shore-Based Equipment Installation and Support Contract
Tyto Athene LLC won a $40 million firm-fixed-price contract on May 12 from the Naval Information Warfare Systems Command to provide shore-based information technology equipment installation, configuration, and lifecycle support services for Fleet Cyber Command facilities across eight Navy regions.