U.S. Navy
Every GovConFeed story on U.S. Navy — contract awards, policy, enforcement, and protests, newest first.
-
Awards
Navy Extends Trident II D5 Guidance Work With $14.9M Draper Modification
Charles Stark Draper Laboratories won a $14,878,252 Navy modification on June 24, 2026, to keep producing the Trident II D5 submarine-launched missile's inertial guidance subsystem, sustaining the assembly and test of the precision accelerometer system at the heart of the sea-based nuclear deterrent.
-
Awards
Innovative Defense Technologies Wins $749M Navy Sole-Source IDIQ to Scale Automated Test and Re-Test Engineering Across Fleet Programs
Naval Sea Systems Command awarded Innovative Defense Technologies a potential $748.6 million noncompetitive IDIQ for automated test and re-test engineering support, extending the company's role in the Navy's Paladin initiative for AI-enabled testing across fleet weapons systems.
-
Awards
Boeing Wins $121M Navy Order to Install Increment 3 Block 2 Upgrades on Six U.S. and Three Australian P-8A Poseidon Aircraft
The Navy awarded Boeing a $121M cost-plus-fixed-fee order on June 22, 2026, for Increment 3 Block 2 A-kit retrofits on six U.S. Navy and three Royal Australian Air Force P-8A Poseidon maritime patrol aircraft, with work running through May 2029.
-
Awards
Lockheed Martin All-Up Rounds Contract Grows $83M to Stockpile Army Hypersonic Conventional Prompt Strike Missiles
Strategic Systems Programs awarded Lockheed Martin Space an $83.18M cost-plus-incentive-fee modification on June 22, 2026, to produce Common Hypersonic All-Up Rounds for U.S. Army stockpile, with work across seven U.S. sites and completion by June 2029.
-
Awards
DIU Awards RIMES Contracts to Mach Industries, Shield AI, and AeroVironment for Ship-Launched 1,400-Mile Strike Drone
DIU selected Mach Industries, Shield AI, and AeroVironment on June 16, 2026 to develop runway-independent maritime strike drones under the RIMES program. Mach Industries' Atlas drone targets 1,400 nm range and 1,000-lb payload from Arleigh Burke destroyers.
-
Awards
Navy Awards Jacobs and Wiley|Wilson JV Parallel $249M A-E IDIQs for NAVFAC Washington Portfolio
NAVFAC Washington awarded two competing $249M architecture-engineering IDIQs on June 18, 2026 — one to Jacobs Government Services and one to a Wiley|Wilson/Burns & McDonnell JV — creating $498M in design capacity for Navy and Marine Corps installations across the national capital region through 2031.
-
Awards
Navy Sole-Sources $22M F/A-18 IRST21 Cooling Unit Contract to Meggitt Defense, Sole Supplier for Full-Rate Production
NAVAIR awarded Meggitt Defense Systems a $22.5M sole-source firm-fixed-price contract for F/A-18 IRST21 Environmental Control Unit Weapons Replaceable Assemblies, citing non-competitive procedures. Contract runs through February 2030, drawing FY2025 and FY2026 aircraft procurement funds.
-
Awards
Lockheed Martin Wins $224M SONAR Contract Modification for Navy Engineering and Production Support
NAVSEA awarded Lockheed Martin Rotary and Mission Systems a $223.9M cost-plus-incentive-fee modification to continue engineering design, development, and production support for Navy SONAR systems, with 3% going to Canada via FMS and work running through September 2027.
-
Awards
NAVFAC Washington Splits $498M A-E IDIQ Between Jacobs and Wiley|Wilson-Burns & McDonnell for DC-Area Naval Facility Design
NAVFAC Washington split a $498M architectural-engineering IDIQ between Jacobs Government Services and the Wiley|Wilson-Burns & McDonnell joint venture on June 18, 2026, awarding each firm a $249M ceiling for DC-area naval facility design through June 2031.
-
Awards
Boeing Wins $880M Navy IDIQ to Train P-8A Poseidon Crews Across Nine Allied Nations
The Navy awarded Boeing an $880M IDIQ on June 18, 2026, for P-8A Poseidon aircrew and maintenance training systems covering 12 locations across nine allied nations. The five-year contract runs through June 2031 and spans Australia, the UK, Germany, South Korea, Norway, New Zealand, Canada, and Singapore.
-
Awards
HII Wins $418M Navy IDIQ for Aircraft Carrier and Amphibious Ship Elevator Maintenance Through 2031
Huntington Ingalls Industries Mission Technologies Corp. was awarded a $417.7M cost-plus-fixed-fee IDIQ by NAVSEA on June 15, 2026, for elevator support unit maintenance and repair on U.S. Navy aircraft carriers and amphibious ships through June 2031.
-
Enforcement
Alabama Defense Contractor LOGZONE Pays $507K to Settle Navy Cybersecurity Fraud After Audit Reveals Score of Negative 170
DOJ announced that LOGZONE Inc. of Huntsville, Alabama agreed to pay $507,144 to resolve False Claims Act allegations tied to cybersecurity non-compliance on two Navy contracts, after a DIBCAC audit found the firm's actual NIST SP 800-171 score was negative 170 — versus a self-reported perfect 110.