U.S. Navy
Every GovConFeed story on U.S. Navy — contract awards, policy, enforcement, and protests, newest first.
-
Enforcement
SBA FY 2025 Small Business Scorecard: DoD Misses Goal as 1,091 Firms Suspended, 628 Contracts Terminated
The Small Business Administration's FY 2025 Governmentwide Small Business Procurement Scorecard shows DoD falling below its 23 percent small business contracting goal for the third consecutive year, while SBA's suspension and debarment program processed 1,091 suspensions and 628 contract terminations related to small business program fraud and misrepresentation.
-
Awards
L3Harris Wins $77M Modification for Trident II D5 Flight Test Instrumentation Systems
Strategic Systems Programs awarded L3Harris Technologies — through its Interstate Electronics Corp. subsidiary — a $77.2 million cost-plus modification on May 1 to continue flight test instrumentation support for the Trident II D5 submarine-launched ballistic missile, the backbone of the U.S. and UK sea-based nuclear deterrent.
-
Awards
NAVSEA Awards $650M Ceiling IDIQ to Eight Firms for Up to 474 Composite Rigid Hull Inflatable Boats
Naval Sea Systems Command awarded a $650 million ceiling, 10-year multiple-award IDIQ to eight manufacturers on May 1 for composite rigid hull inflatable boats — a floating small-craft program that supports Navy SEALs, surface combatants, and force protection teams worldwide.
-
Awards
General Dynamics Electric Boat Wins $2.3 Billion Undefinitized Contract for Virginia-Class Block VI Submarine Pre-Construction
Naval Sea Systems Command awarded General Dynamics Electric Boat a $2.3 billion undefinitized contract action on May 11 for long-lead material and early manufacturing on Virginia-class Block VI submarines — the largest pre-construction award in the program's history.
-
Awards
Conrad Shipyard Wins $122M Navy Contract to Build Four Yard Repair, Berthing, and Messing Vessels
The Navy awarded Conrad Shipyard LLC a $122.4 million firm-fixed-price contract on May 13 to design and construct four Yard Repair, Berthing, and Messing vessels — floating maintenance platforms that support submarine and surface ship repair at forward-deployed and continental U.S. locations.
-
Awards
Forward Slope Wins $68M Navy Contract for Command-and-Control Cybersecurity Support to Taiwan
The Navy awarded Forward Slope Inc. a $68 million contract on May 12 to provide command, control, communications, and computers enterprise services and cybersecurity support to Taiwan — a contract that reflects the U.S. military's expanding security assistance footprint in the Indo-Pacific.
-
Awards
HII Wins $220M Navy IDIQ Modification for Aircraft Carrier Engineering and Maintenance Support
The Navy awarded Huntington Ingalls Industries Fleet Support Group a $220.7 million IDIQ modification on May 13 to continue aircraft carrier engineering, maintenance, and lifecycle support work through February 2027 at CONUS, overseas, and forward-deployed locations.
-
Awards
Nine Firms Win Spots on Navy's $349M IDIQ for Unmanned Maritime Systems Support
NIWC Pacific awarded a $349 million multiple-award IDIQ on May 12 to nine firms — including HII Mission Technologies, Peraton, SAIC, and ManTech — to support the Navy's growing unmanned maritime systems portfolio through 2034.
-
Awards
Lockheed Martin RMS Receives $75.6M Modification for Navy and Coast Guard Integrated Combat Systems
Lockheed Martin Rotary and Mission Systems picked up a $75.6M contract modification on May 8 for systems engineering and software integration supporting integrated combat systems across Navy and Coast Guard surface forces, with work split between Moorestown, NJ and Columbia, MD.
-
Awards
HII Unmanned Systems Gets $37M Lionfish Small Unmanned Undersea Vehicle Contract Modification
HII Unmanned Systems received a $37M firm-fixed-price modification on May 7 for Lionfish Small Unmanned Undersea Vehicle production and support equipment, continuing deliveries to the Navy from Pocasset, Massachusetts, through May 2027.
-
Awards
General Dynamics Mission Systems Awarded $66M for Virginia- and Columbia-Class Submarine Data System
General Dynamics Mission Systems won a $66.2M SBIR Phase III IDIQ on May 7 to deliver the Data Acquisition and Retrieval System for Virginia- and Columbia-class submarines, with work across Groton, CT, and test ranges in Florida and the Bahamas through May 2031.
-
Awards
Applied Research Associates Wins $111.5M Naval Research Laboratory High-Performance Computing IDIQ
Applied Research Associates landed a $111.5M IDIQ from the Naval Research Laboratory on May 8 for high-performance computing R&D support, including cryptographic capability development and network protocol design at the NRL's Washington, D.C. facility.