Maximus Federal Services keeps its General Services Administration contact-center blanket purchase agreement after the Government Accountability Office rejected every merits argument from losing vendor Senture, LLC and threw out its claim that Maximus gained an edge by hiring a former GSA employee. In a decision dated Nov. 19, 2026, and posted Nov. 24, GAO's Senture, LLC, B-424262.2, B-424262.3 decision is listed with the disposition: "We deny the protest, in part, and dismiss it, in part." The ruling also reminds contractors that a vendor who would not win even if the awardee were knocked out cannot press a conflict claim at GAO.

Senture challenged GSA's award to Maximus Federal Services, Inc. of McLean, Virginia. The competition ran under request for quotations 47QPCA25Q0024, issued June 13, 2025, to Federal Supply Schedule holders under FAR subpart 8.4. GSA sought a multilingual, omnichannel Contact Center-as-a-Service solution and planned one BPA with a one-year base period and four one-year options.

How Maximus and Senture Scored on the GSA Contact-Center RFQ

GSA rated both vendors High Confidence overall. The gap came on the technical solution factor, where Maximus earned High Confidence and Senture received Some Confidence.

Price followed the same pattern. GSA evaluated quotes against pricing scenarios. On Scenario 1, Senture quoted $802,710, which the decision describes as about 16.26 percent higher than Maximus's price; the Maximus figure is redacted in the public version.

That combination, a stronger technical rating at a lower price, left GSA little tradeoff to justify. Senture attacked the evaluation from four directions:

  • GSA's exchanges with Senture were misleading and not meaningful.
  • GSA's technical evaluation was unreasonable.
  • The price tradeoff was flawed and treated vendors unequally.
  • Maximus held an unfair competitive advantage from hiring a former GSA employee, and GSA's investigation of that hire was unreasonable.

Why GAO Found GSA's Exchanges With Senture Were Fair

Senture's first argument targeted the back-and-forth GSA held with vendors during the evaluation. Under FAR subpart 8.4, agencies buying off the schedules do not have to follow the formal discussion rules of FAR part 15, but when they choose to hold exchanges, GAO expects those exchanges to be fair and not misleading.

GAO found GSA met that standard. The agency tied its questions to the RFQ's evaluation criteria, and those questions led Senture to the area of its quotation that needed revision. An agency does not have to rewrite a vendor's quote for it or spell out every way to raise a rating; it has to point the vendor in the right direction. GAO concluded GSA did so, which ended the misleading-exchanges claim.

Senture's Extra Features Did Not Earn Extra Credit

The technical challenge turned on a familiar problem for protesters. Senture argued GSA should have given it more credit for features in its solution. GAO's answer was that Senture did not explain how those features exceeded the RFQ's requirements. A capability that only meets the requirement does not have to earn a strength, and disagreement with an agency's judgment does not make that judgment unreasonable.

The record gave GAO no basis to second-guess the Some Confidence rating on the technical solution factor or the High Confidence rating GSA assigned to Maximus.

Scenario Pricing and the Unequal-Treatment Claim

Senture's third ground argued that GSA's price tradeoff was flawed and that the agency evaluated prices unequally. GAO disagreed. It found the tradeoff consistent with the RFQ, which used scenario pricing for comparison, and that the differences in treatment reflected real differences between the quotations, not a skewed method.

Advertisement

With Maximus rated higher technically and priced lower on Scenario 1, the tradeoff question was close to self-answering. A protester arguing about tradeoff reasoning usually needs to show the agency paid a premium for something it did not value properly, or passed over a cheaper quote without a sound explanation. Neither situation applied here.

Why Vendor C Sank Senture's Former-Employee Claim

The fourth ground drew the most attention because it raised the hiring of a former GSA employee by Maximus. Senture argued the hire gave Maximus an unfair competitive advantage and that GSA's investigation into it was unreasonable.

GAO dismissed the claim because Senture was not an interested party, rather than ruling on whether the hire created an advantage. GAO's bid protest rules require a protester to have a direct economic interest in the outcome. In this competition, a third vendor, identified in the decision as Vendor C, received a higher technical rating than Senture and quoted a lower Scenario 1 price. Even if GAO had agreed with Senture and Maximus were excluded from the competition, Vendor C, not Senture, would be next in line for award.

Advertisement

Because Senture's merits challenges to its own evaluation failed, nothing moved it ahead of Vendor C, and the conflict claim fell with them.

What It Means for Contractors

The Senture decision offers several practical points for vendors competing for GSA schedule BPAs and similar task orders.

Check your place in line before filing a conflict claim. An organizational conflict, unfair advantage, or former-employee allegation only helps a protester who would get the award if the awardee were removed. When another vendor sits between you and the award with a better technical rating and a lower price, GAO will dismiss the claim without reaching its merits. Protesters in that position need a winning merits argument that also lifts them over the intervening vendor.

Tie claimed strengths to the solicitation. Arguing that features deserved credit requires showing they exceed stated requirements in a way the evaluation criteria reward. GAO will not award strengths for capabilities that simply meet the requirement.

Read exchange questions closely. When an agency's questions track the evaluation criteria, GAO will treat them as fair notice of a weakness. Vendors should treat every exchange question as a signal of where their rating stands and revise accordingly, because a later claim that the questions were too vague is unlikely to succeed.

Raise hiring concerns early. Questions about former agency employees working for a competitor carry more weight when raised with the contracting officer during the competition, and when the protester is positioned to benefit from a remedy.

For GSA, the ruling clears the way to proceed with Maximus on the contact-center BPA, with its one-year base and four option years.

Sources