Anduril
Every GovConFeed story on Anduril — contract awards, policy, enforcement, and protests, newest first.
-
Awards
Air Force Awards Anduril and General Atomics Production Contracts for First Operational CCA Drone Wingmen
Air Force picked Anduril (FQ-44A Fury) and General Atomics (FQ-42A Dark Merlin) for the first CCA production contracts June 17, 2026, bypassing Boeing, Lockheed Martin, and Northrop Grumman. Three production lots target 150 aircraft by decade-end at under $30M per unit.
-
Awards
CBP Awards Anduril $363 Million for AI-Enabled Extended Range Sentry Towers Along Southwest Border
CBP awarded Anduril $363M for 200+ autonomous Extended Range Sentry Towers on the southwest border. Awarded December 2025, publicly disclosed June 12, 2026; 40+ units already delivered.
-
Awards
Air Force to Begin FAMM Cruise Missile Production in September, Eyes 28,000 Units Over Five Years With Anduril and CoAspire
Air Force Chief of Staff Gen. Kenneth Wilsbach confirmed September 2026 production start for the Family of Affordable Mass Missiles, with FY2026 funding already covering the first 1,000 rounds and a five-year plan to procure nearly 28,000 weapons.
-
Awards
State Department Approves $1.98B Anduril Counter-Drone Sale to Kuwait After Iran Airport Strike
The State Department approved a $1.98B Foreign Military Sale of Anduril counter-drone systems to Kuwait days after Iran struck Kuwait International Airport, killing one person and injuring more than 60.
-
Awards
Pentagon Awards Framework Contracts to Anduril, Leidos and Two Others for 10,000 Low-Cost Cruise Missiles
The Defense Department reached framework agreements with four vendors — Anduril, Leidos, CoAspire, and Zone 5 — to procure at least 10,000 low-cost containerized cruise missiles within three years, with test flights beginning June 2026.
-
Awards
Space Force Awards $3.2 Billion to 12 Companies to Prototype Golden Dome Space-Based Interceptors
Space Systems Command awarded 20 Other Transaction Authority contracts worth up to $3.2 billion to 12 companies — including SpaceX, Anduril, Lockheed Martin, and Northrop Grumman — to develop space-based interceptors for the Golden Dome missile defense architecture.
-
Awards
Anduril Lands $100M Space Force Contract Modification to Double SDANet Space Surveillance Mesh
Space Systems Command expanded Anduril's SDANet contract ceiling from $99.7M to $200M, funding the next phase of a Lattice-powered mesh network connecting Space Surveillance Network sensors worldwide.
-
Awards
Space Force Triples Andromeda Ceiling to $6.2B — 14 Firms to Replace GSSAP and SILENTBARKER Spy Satellites
The Andromeda IDIQ, awarded to 14 firms in April 2026 for next-generation geosynchronous surveillance satellites, has seen its ceiling raised from $1.84B to $6.2B. The program replaces GSSAP (run by Space Force) and SILENTBARKER (run jointly with NRO). FY2027 urgency is driving the acceleration.
-
Awards
Air Force CCA program — Anduril and General Atomics in flight tests, production decision in 2026
Two prototypes flying: Anduril's YFQ-44A and General Atomics' YFQ-42A. Both companies received Increment 1 contracts in 2024; live flight tests began Aug-Oct 2025. Air Force is integrating government-owned Autonomy Reference Architecture and targets production decision in 2026.
-
Awards
Palantir's $10B Army enterprise deal and Maven going Pentagon-wide
The Army's 10-year $10B Palantir enterprise agreement plus expanding Maven AI adoption across the services signals an inflection point — commercial data platforms are becoming the integration backbone for DoD operations.
-
Awards
Army awards Anduril $20B enterprise deal — and quietly redraws the procurement map
The Army consolidated 120 separate Anduril contracts into one 10-year, $20B-ceiling enterprise vehicle built around the Lattice platform. The first task order is already out. What it signals for non-traditional vendors and the small firms beneath them.
-
Awards
Salesforce wins $5.6B Army IDIQ — the largest commercial SaaS deal in DoD history
A 10-year IDIQ executed through a wholly-owned subsidiary brings agentic AI, Slack, and Salesforce's data fabric to the Department of War. The deal is also a signal: predictable pricing and days-not-months procurement timelines are the new ask.