Anduril
Every GovConFeed story on Anduril — contract awards, policy, enforcement, and protests, newest first.
-
Awards
Navy OTA Moves SLCM-N Nuclear Cruise Missile Into Development With Raytheon
The Navy awarded Raytheon an Other Transaction Authority agreement to take the submarine-launched SLCM-N nuclear cruise missile from concept work into development, with Anduril Rocket Motor Systems, Divergent and Williams International on the team. No dollar value was disclosed.
-
Awards
Air Force Counter-Air Missile Program Adds Castelion to Low-Cost Interceptor Push
Castelion holds two Air Force CAMP prototype contracts for a ground-launched counter-air missile, launch pod and containerized launcher, joining Sierra Nevada's $124M award and Anduril's launcher work in a program targeting rounds under $500,000.
-
Awards
Space Force Puts Anduril, Booz Allen and Peerless in a 3-Month SEWOL Jamming Software Bake-Off
Space Systems Command awarded Anduril, Booz Allen Hamilton and Peerless Technologies about $10 million in Phase I OTA prototypes for SEWOL, a cloud-native electromagnetic warfare C2 system. One vendor will win the build in the $60 million program.
-
Awards
$2.5M Army Contract Puts Safe Pro Mine Detection on Anduril's Ghost-X
The Army awarded Safe Pro Group a $2.5 million prime contract, its first, to run threat-detection software on Anduril's Ghost-X drone to spot landmines and other explosive threats ahead of M1 Abrams tanks. The award came under a Commercial Solutions Opening and covers test, evaluation and demonstration.
-
Awards
Navy and GSA Quadruple Gecko Robotics' Ship-Inspection IDIQ Ceiling to $300 Million
Six months after a $71 million award, the Navy and GSA raised the ceiling on Gecko Robotics' government-wide IDIQ to $300 million, clearing the way for its Komodo deck-scanning robots and AI inspection tools to move from 18 Pacific Fleet ships to the Atlantic Surface Fleet.
-
Awards
$93.6M in Army NGC2 Application Awards Splits Across Nine Companies, Headed to I Corps
The Army awarded one-year contracts totaling $93.6 million to nine companies, including General Dynamics Mission Systems, LMI and Rune Technologies, to build Next Generation Command and Control apps on the Anduril-led data baseline for I Corps in the Indo-Pacific.
-
Awards
$99M Army IDIQ Moves Shift5 From NGC2 Prototype Partner to Program Component
Shift5 says a new Army IDIQ worth up to $99 million moves it from Anduril's NGC2 prototype team to a direct program component. The ceiling contract, awarded by Army Contracting Command at Aberdeen, runs to Sept. 2031.
-
Awards
$1.8B Army NGC2 Contract Moves Anduril Data Layer From Division Prototype to I Corps Fielding
Article fact-checked against GovConWire and Defence Blog. Defense Daily was paywalled, so I removed it and its two quotes and the Oct. 5 date. Inference about the June-to-October follow-on contract was reworded. All other claims trace to the two sources.
-
Awards
Up to $2.9B Navy Contract Backs Anduril's $3.7B Arsenal-2 Submarine Yard at Sparrows Point
The Navy awarded Anduril a contract of up to $2.9B, paid on demonstrated output, to back Arsenal-2, a $3.7B privately funded Maryland yard that will build Virginia-class components for Electric Boat and Newport News starting in 2030.
-
Awards
Army Selects Anduril and Palantir to Lead NGC2 Common Data Layer, Moving Command-and-Control Modernization From Prototype to Production
The Army announced Anduril Industries as lead for the Next Generation Command and Control common data layer baseline, partnering with Palantir and Raft to provide an edge-to-cloud data mesh that will scale to all 11 Army divisions over five years.
-
Awards
Anduril Unveils ArsenalOS as Digital Backbone of Arsenal-1 Factory — Software Links Design to Mass Production of Fury, Roadrunner, Barracuda on Same Floor
Anduril launched ArsenalOS, a unified software platform managing design, production, supply chain, and sustainment across its Arsenal-1 campus near Columbus, Ohio, where Roadrunner, Barracuda, and YFQ-44A Fury are produced on the same reconfigurable floor.
-
Awards
Anduril Wins $363M CBP Contract for 200+ AI-Powered Extended Range Sentry Towers Capable of Tracking Targets at 7.5 Miles
U.S. Customs and Border Protection awarded Anduril Industries a $363 million contract for more than 200 Extended Range Sentry Towers, each standing 80 feet tall and detecting targets at a 12-kilometer range, expanding a border surveillance partnership dating to 2019.