$672.5M TSA Checkpoint Equipment Deployment Recompete Stays With Leidos
TSA kept Leidos as sole deployer of airport checkpoint screening equipment under a single-award IDIQ worth up to $672.5M over eight years, up from the $470.7M 2021 contract. Three bids came in; Leidos had drawn $435M in orders on the predecessor.
Read the story →