U.S. Army
Every GovConFeed story on U.S. Army — contract awards, policy, enforcement, and protests, newest first.
-
Awards
$200M Tobyhanna Army Depot MRC Contract Goes to Structural Engineering Group
Army Contracting Command awarded Structural Engineering Group Inc. a $200 million five-year IDIQ on June 23, 2026 for maintenance, repair, and construction at Tobyhanna Army Depot, DoD's largest C5ISR electronics maintenance facility.
-
Awards
$860M DLA Sole-Source IDIQ Goes to Small Business for Army Engine Fuel Tanks
Defense Logistics Agency Weapons Support awarded Integrated Procurement Technologies a $860.7M sole-source IDIQ for Army engine fuel tanks, justified under FAR 6.302-1 as the only responsible source for the required components.
-
Awards
Lockheed Martin All-Up Rounds Contract Grows $83M to Stockpile Army Hypersonic Conventional Prompt Strike Missiles
Strategic Systems Programs awarded Lockheed Martin Space an $83.18M cost-plus-incentive-fee modification on June 22, 2026, to produce Common Hypersonic All-Up Rounds for U.S. Army stockpile, with work across seven U.S. sites and completion by June 2029.
-
Awards
L3Harris and Turkey's Skydagger Sign Co-Production Pact to Build FPV Drone Interceptors in the U.S. for Integration Into VAMPIRE Counter-Drone System
L3Harris Technologies and Turkish firm Skydagger signed a June 16 MOU to co-produce first-person-view drone interceptors in the U.S. for integration into L3Harris's VAMPIRE counter-UAS platform, with integration targeted by end of 2026.
-
Awards
Army Awards Rune Technologies $99M IDIQ for TyrOS Logistics Platform — One Bid Received
Army Contracting Command awarded Rune Technologies Inc. a $99M five-year IDIQ (W9128Z-26-D-A002) on June 16, 2026 for the TyrOS logistical operations software platform. A single bid was received; the vehicle runs through June 2031.
-
Awards
Army Awards 19 Firms $396M IDIQ to Rebuild Soldier Maintenance Training Across Weapons Systems Through 2033
Army Contracting Command Orlando selected 19 companies from 24 bidders for a $396M IDIQ to design, develop, produce, and sustain maintenance trainers for multiple Army weapons platforms through June 2033.
-
Awards
Army Expands Alloy Surfaces' Sole-Source Decoy Flare Contract by $300M to $328.8M Total Amid Rising Infrared Missile Threats
The Army added $300 million to Alloy Surfaces Company's sole-source contract for infrared decoy flares, bringing the total to $328.8 million and extending production through March 2031 as drone-launched heat-seeking missiles intensify aircraft survivability demand.
-
Awards
General Atomics Joins Army's Three-Way Extended-Range Artillery Race With 74-Mile Projectile After Successful Yuma Test
The Army announced a contract for General Atomics Electromagnetic Systems under the Extended Range Artillery Projectile program, adding a third competitor alongside General Dynamics and BAE Systems in a race to field a 155mm guided round capable of hitting targets beyond 65 kilometers.
-
Policy
Army Signs Counter-Drone Marketplace Expansion With Nine NATO Allies at Eurosatory 2026
Army Secretary Dan Driscoll signed a joint statement of intent at Eurosatory on June 16 expanding the U.S. Army UAS and Counter-UAS Marketplaces to nine NATO allies — Sweden, Denmark, Norway, France, Poland, the UK, Netherlands, Italy, and Lithuania. The Army aims to reach 25 member nations by end of summer 2026.
-
Awards
DISA Posts $850M Sources Sought for Army Endpoint Security Recompete as Incumbent Everforth ECS Faces Challenge
DISA posted a sources-sought notice on June 16, 2026, for the Army Endpoint Security Event Management System, a consolidated $850M recompete covering Army enterprise and tactical networks. Incumbent Everforth ECS holds both current contracts, both expiring in 2027.
-
Awards
Day & Zimmermann Wins $2.3B Army Contract to Operate Nation's Largest Ammunition Depot Through 2046
The Army awarded Day & Zimmermann Hawthorne Corp. a $2.3B firm-fixed-price contract on June 9, 2026, to operate, maintain, and modernize Hawthorne Army Depot in Nevada — the U.S. military's largest ammunition storage facility — through December 2046.
-
Policy
Army MAPS Amendment 8 Resets the $50B Competition for Small Businesses
The U.S. Army has issued Amendment 8 to the $50 billion MAPS IDIQ solicitation, eliminating the Emerging Large Business category, expanding past performance eligibility, restructuring CPARS scoring, and relaxing accounting system requirements — all in response to a sustained wave of pre-award GAO protests.