U.S. Marine Corps
Every GovConFeed story on U.S. Marine Corps — contract awards, policy, enforcement, and protests, newest first.
-
Awards
Marine Corps MRADR Air-Defense Radar Moves Toward Fielding With $40.8M Leidos Order for 14 Systems
Leidos subsidiary Dynetics will build 14 production-representative Medium Range Air Defense Radars for the Marine Corps under a $40.8M modification, moving the low-signature radar from prototype toward fielding, with work due by August 2028.
-
Awards
$93.2M Navy Order Buys F-35 Depot Test Sets, Cyber Upgrades and Ejection-Seat Repair Capacity
NAVAIR placed a $93.2 million sole-source order with Lockheed Martin for F-35 depot avionics test sets, test program set updates, electronic warfare OS upgrades and expanded ejection-seat repair capacity, with most work in Malabar, Florida, and Nashua, New Hampshire, through January 2030.
-
Awards
$985M DLA Base Supply Center IDIQ Opens to 12 AbilityOne Nonprofit Agencies for the Blind
DLA Troop Support awarded 12 AbilityOne nonprofit agencies for the blind seats on a shared $985 million, five-year IDIQ for base supply center supplies serving all military services and civilian agencies, with more awards expected under solicitation SPE8EN-25-R-0004.
-
Awards
$2.9B INDOPACOM Logistics Order Becomes ManTech's Largest Award Ever
ManTech has confirmed a potential $2.9 billion, seven-year ILS2 task order to support U.S. Indo-Pacific Command and Special Operations Command Pacific with standard and non-standard logistics. It is the largest award in the company's 58-year history. GSA awarded it through OASIS+ on Sept. 30, and an Australian landing-ship operator is on the team.
-
Awards
Marine Corps Low-Profile Drone Boat Prototypes Go to Saronic, Sea Machines and Newcomer Rudder Industries
DIU picked Rudder Industries, Saronic Technologies and Sea Machines Robotics to prototype the Marine Corps Autonomous Low Profile Vessel, a semi-submersible resupply drone meant to carry 18,000 pounds up to 2,000 nautical miles. No dollar values were disclosed; each firm has 180 days to demonstrate a boat.
-
Awards
Marine Corps Lifts M27 Rifle Contract Ceiling to $84.6M With Sole-Source Heckler & Koch Deal
The Marine Corps raised the ceiling on Heckler & Koch's sole-source M27 infantry automatic rifle IDIQ by $45.4 million to $84.6 million, keeping orders flowing through April 2028 with 70% of the work in Oberndorf, Germany.
-
Awards
$269M Landing Ship Medium Order Brings Hanwha Philly Shipyard Into Navy Shipbuilding
TOTE Services, the Navy's vessel construction manager for the Landing Ship Medium, picked Hanwha Defense USA to build one LSM at Hanwha Philly Shipyard for $269 million, with options for three more. It is the first award under the VCM model and Hanwha's first Navy ship contract.
-
Awards
SOCOM Taps Smack Technologies for Up-to-$7.5M Omega AI Planning Prototype
U.S. Special Operations Command will prototype Smack Technologies' Omega, an AI campaign-planning tool that repairs plans in seconds and runs without constant cloud links, under an Other Transaction agreement worth up to $7.5 million. The startup expects production across multiple branches in coming months.
-
Awards
$230.1M Marine Corps Order Puts 32 ACV Recovery Vehicles Into BAE Production
The Marine Corps put 32 ACV recovery variants into full-rate production with a $230.1M firm-fixed-price modification to BAE Systems, fully obligated with FY2026 funds. Palfinger cranes get integrated at Anniston Army Depot, and the contract ceiling now stands at about $4.096B.
-
Awards
$869M in Navy and Air Force Audit Work Goes to EY on Single Quotes
DFAS awarded Ernst & Young two labor-hour contracts worth up to $869.4M combined to audit Navy, Marine Corps and Air Force financial statements. Each competitive solicitation drew one quote; the Air Force deal succeeds EY's 2022 contract for the same work.
-
Awards
Marine Corps Locks In Up to $404 Million Sole-Source Kongsberg Framework for NMESIS Launchers Through 2034
The Marine Corps gave Kongsberg a sole-source, firm-fixed-price contract worth up to $404.4 million for Naval Strike Missile launchers and weapon control systems through 2034. No money was obligated at award; call-offs will set the real spend.
-
Awards
Navy Orders 10 More CMV-22B Osprey Engines in $36.5M Rolls-Royce Deal
NAVAIR awarded Rolls-Royce a $36.5 million sole-source contract on July 13, 2026, for 10 AE 1107C Lot 28 turboshaft engines powering the Navy CMV-22B Osprey, with completion due May 2028.