U.S. Space Force
Every GovConFeed story on U.S. Space Force — contract awards, policy, enforcement, and protests, newest first.
-
Awards
Army Adds $34.4M to Amentum's Combat Aviation Brigade Maintenance Contract, Lifting Its Face Value to $469.6M
The Army added $34.4 million to Amentum's worldwide rotary-wing maintenance contract for Combat Aviation Brigades, raising its face value to $469.6 million. Four partner nations paid $8.4 million of the money through Foreign Military Sales, and the work now runs to Nov. 30, 2027.
-
Awards
$985M NSSL Lane 2 Modifications Go to SpaceX, ULA and Blue Origin as Vulcan Failure Squeezes Launch Capacity
Space Systems Command awarded SpaceX, ULA and Blue Origin up to $985 million in NSSL Phase 3 Lane 2 contract modifications running to April 2033, a day after a Vulcan failure left Falcon 9 and Falcon Heavy as the only other rockets authorized for Lane 2 critical payloads.
-
Awards
Space Force Puts Anduril, Booz Allen and Peerless in a 3-Month SEWOL Jamming Software Bake-Off
Space Systems Command awarded Anduril, Booz Allen Hamilton and Peerless Technologies about $10 million in Phase I OTA prototypes for SEWOL, a cloud-native electromagnetic warfare C2 system. One vendor will win the build in the $60 million program.
-
Awards
$450M Space Force IDIQ Puts Viasat at the Center of the Golden Dome Space Data Network
Space Systems Command picked Viasat for a competitive IDIQ worth up to $450 million, with a $115 million first task order, to design, field and scale the Mission Operations Center that will orchestrate data across the multi-vendor Space Data Network Backbone supporting Golden Dome.
-
Awards
$150M Pentagon Loan Commitment Backs LeoLabs Push to Build Dozens More Space-Tracking Radars
The Pentagon's Office of Strategic Capital offered LeoLabs a conditional loan of up to $150 million, matched by private money for $300 million total, to complete two U.S. manufacturing facilities by 2028 and add dozens of radars to its global network by 2030.
-
Awards
$945.9M Boeing MILSATCOM Sustainment Deal Goes Sole-Source Over Data Rights
Space Systems Command plans a sole-source award worth up to $945.9M to Boeing to sustain WGS and UFO satellites and ground systems, saying Boeing has repeatedly refused to sell the data rights other contractors would need. Comments are due Nov. 17.
-
Awards
$150M Pentagon Loan Commitment Would Fund Second Stoke Space Pad at Cape Canaveral
The Pentagon Office of Strategic Capital has committed a $150 million conditional loan to Stoke Space to build a second Nova launch pad at Cape Canaveral, tied to the company Series E and an early-2027 timeline.
-
Awards
$1.37M Buys Space Force Its First Operational Commercial Space Reserve, Six SDA Firms In
Space Systems Command awarded the first operational Commercial Augmentation Space Reserve contracts to six space domain awareness firms, including LeoLabs, Slingshot and Anduril, worth $1.37 million total, while shutter-control and indemnification terms remain unresolved.
-
Awards
Space Force Missile-Warning Radar Digitization Goes to Raytheon After $309.5M Prototype Deal
Raytheon says the Space Force selected it to digitize missile-warning radar back ends under GBRD. The value traces to July prototype agreements: $309.5M for Raytheon of a $423.4M total shared with SciTec and WildStar, with $783M in the FYDP.
-
Awards
Space Force Taps BAE for Jam-Resistant, Ultra-Compact RF Terminals on a Space Data Layer
Space Systems Command has tapped BAE Systems to design and demonstrate ultra-compact, jam-resistant RF terminals for a space-based data layer, built on BAE's space-hardened software-defined radios and meant to work from LEO to GEO. No contract value or terminal count was disclosed.
-
Awards
$572M NISSC III Contract Keeps Amentum Running NORAD Cheyenne Mountain Systems Through 2033
Space Systems Command awarded Amentum Technology a $572,358,987 cost-plus-incentive-fee contract to operate and sustain NORAD Cheyenne Mountain warning and space command systems through Sept. 2033 after seven offers.
-
Awards
SDA Books $1.75B for 36 Golden Dome Missile-Tracking Satellites With L3Harris, Sierra Space
The Space Development Agency awarded L3Harris $955M and Sierra Space $798M to build 36 Tranche 3 missile-tracking and missile-defense satellites for Golden Dome for America, bringing the Tracking Layer to 104 spacecraft with delivery expected by end of 2028.