U.S. Space Force
Every GovConFeed story on U.S. Space Force — contract awards, policy, enforcement, and protests, newest first.
-
Awards
Space Force Taps BAE for Jam-Resistant, Ultra-Compact RF Terminals on a Space Data Layer
Space Systems Command has tapped BAE Systems to design and demonstrate ultra-compact, jam-resistant RF terminals for a space-based data layer, built on BAE's space-hardened software-defined radios and meant to work from LEO to GEO. No contract value or terminal count was disclosed.
-
Awards
$572M NISSC III Contract Keeps Amentum Running NORAD Cheyenne Mountain Systems Through 2033
Space Systems Command awarded Amentum Technology a $572,358,987 cost-plus-incentive-fee contract to operate and sustain NORAD Cheyenne Mountain warning and space command systems through Sept. 2033 after seven offers.
-
Policy
Space Force Delegates 90% of Contracting Authority as Third PAE Tranche Completes Nine-Portfolio Overhaul
The Space Force filled its final three Portfolio Acquisition Executive seats on July 14, completing a nine-portfolio restructuring that pushes 90-92% of contracting authority down to mission-level leaders.
-
Awards
SDA Books $1.75B for 36 Golden Dome Missile-Tracking Satellites With L3Harris, Sierra Space
The Space Development Agency awarded L3Harris $955M and Sierra Space $798M to build 36 Tranche 3 missile-tracking and missile-defense satellites for Golden Dome for America, bringing the Tracking Layer to 104 spacecraft with delivery expected by end of 2028.
-
Awards
Colorado Startup LEAP Sees Space Force Contract Jump 13-Fold to $100M for Satellite Resupply
A $93M modification lifts Pivotal Space Inc.'s (LEAP) Space Force SBIR Phase III contract from $7M to $100M for satellite resupply and integration evaluation work, as the Broomfield firm scales its launch vehicle line.
-
Awards
Space Force Adds Impulse Space and Relativity Federal to $5.6B Lane 1 Launch Pool
Space Force awarded Impulse Space and Relativity Federal spots on the $5.6B NSSL Lane 1 launch IDIQ, adding an upper-stage-only prime and a reusable-rocket startup to a pool that now spans seven companies through FY2029.
-
Enforcement
Raytheon's GPS Ground System Cancelled as Space Force Satellite Overruns Hit $11.4B
GAO's July 2026 Weapon Systems Assessment finds $11.4 billion in cost overruns across Space Force satellite programs and confirms the Pentagon quietly cancelled Raytheon's OCX ground-control system for GPS after years of software delays and cost growth.
-
Policy
Space Force Reopens SCAR Satellite-Control Antenna Program to Commercial Bidders After Killing $1.7B AeroVironment Award
The Space Force issued a Commercial Solutions Opening in June 2026 to recompete the SCAR satellite-control antenna program around commercial phased-array systems, months after terminating an estimated $1.7 billion contract tied to AeroVironment for convenience.
-
Awards
$30M Stockpile Order Extends United States Antimony's $245M DLA Critical-Mineral Deal
The Defense Logistics Agency placed a maximum $29.98M delivery order with United States Antimony Corp. for antimony metal ingots bound for the National Defense Stockpile, drawing on a five-year sole-source IDIQ worth about $245M aimed at reducing reliance on China.
-
Awards
Air Force Taps Colorado Firm for $20.6M On-Orbit Thruster Experiment Program Through 2036
Air Force Test Center awards Geneva Technologies a $20.6M cost-plus contract to fly novel space thrusters and conduct on-orbit resiliency experiments through 2036, supporting Space Force satellite survivability goals.
-
Awards
Space Force Sets 16-Hour Launch Record With Victus Haze, Opening Rapid Reconstitution to On-Orbit Inspection
Rocket Lab's Electron launched the Victus Haze satellite for the Space Force on June 19, 2026, just 16 hours and 42 minutes after receiving notice — shattering the 2023 Victus Nox record of 27 hours and demonstrating rapid rendezvous with a non-compliant satellite in LEO.
-
Awards
Boeing Beats Lockheed for $2B Space Force Contract to Build Two Next-Generation MUOS Narrowband Satellites
Space Force selected Boeing over Lockheed Martin for a $2 billion fixed-price-incentive contract to design, develop, and produce two Mobile User Objective System Phase II satellites, the first competitive narrowband SATCOM production award Boeing has won from the service.