Awards
Contract awards across defense and civilian agencies — who won, what for, and what it signals for the market.
-
Awards
Geost Wins $89.5M Space Systems Command Modification for Oculus Host Satellite Program
Space Systems Command awarded Geost LLC an $89.5 million contract modification for the Oculus Host program — a classified or restricted satellite program supporting national security space operations.
-
Awards
SAIC Wins $112M Naval Sea Systems Command Contract for MK 48 MOD 7 Torpedo Components
Naval Sea Systems Command awarded Science Applications International Corp. a $112.3 million contract for production, spare parts, and engineering support for the MK 48 MOD 7 heavyweight torpedo — the U.S. Navy's primary submarine-launched weapon.
-
Awards
Integrated Procurement Technologies Wins $19M Wattmeter Supply Contract for Naval Surface Warfare Center
Integrated Procurement Technologies received a $19 million sole-source contract to supply precision wattmeters and electronic test equipment to Naval Surface Warfare Center, Crane Division.
-
Awards
Pond Constructors Awarded $48M Army Corps of Engineers Infrastructure Maintenance Contract
Pond Constructors, an Atlanta-based firm, won a $48 million Army Corps of Engineers contract for infrastructure maintenance across multiple districts, covering levees, dams, and navigation structures.
-
Awards
World Wide Technology Lands $40M AI-Powered SOC Contract With Air Combat Command
World Wide Technology secured a $40 million contract to deliver an AI-enhanced Security Operations Center for Air Combat Command, integrating machine learning threat detection with existing Air Force cyber infrastructure.
-
Awards
Lockheed Martin Wins $879M F-35 Armament Contract for Lots 18 and 19
The Pentagon awarded Lockheed Martin a $879 million modification for F-35 armament integration covering production Lots 18 and 19, continuing the program's decade-long weapons modernization track.
-
Advertisement
-
Awards
PlaneWave Instruments Wins $94M Space Force Space Surveillance IDIQ
PlaneWave Instruments of Adrian, Michigan secured a $94.16 million Space Force IDIQ for Decentralized Autonomous Organization Systems supporting the Space Surveillance Network, a notable win for a small optics company outside the traditional defense prime tier.
-
Awards
C2 Defense Wins $97.8M Army Secure Voice Interoperability Contract
C2 Defense Inc. of Savannah, Georgia secured a $97.8 million Army contract to deliver JITC-certified unified communications software enabling secure, scalable voice interoperability across military networks through May 2029.
-
Awards
Ansys Government Wins $82M AFTC Contract for Simulation Software at Edwards AFB
The Air Force Test Center awarded Ansys Government Initiatives an $82 million indefinite-delivery/indefinite-quantity contract for software licenses and ancillary engineering services, including modeling and simulation, at Edwards Air Force Base.
-
Awards
Red Point Construction Wins $38M Design-Build Contract for Clear Space Force Station Infrastructure
USACE Alaska District awards Red Point Construction a $38.6 million design-build contract to remove and replace aging steam, condensate, and water piping infrastructure at Clear Space Force Station in Alaska, with an option ceiling of $48.4 million and completion through May 2030.
-
Awards
WSP Solutions Wins $249M NAVFAC Northwest Marine Waterfront A&E Contract
Naval Facilities Engineering Systems Command Northwest awarded WSP Solutions a $249 million IDIQ contract for marine waterfront architect and engineering services across the Pacific Northwest naval installation complex.
-
Awards
Lockheed Martin Awarded $61M to Develop PAC-3 MSE Containerized Launcher and RIG-360 System
Army Contracting Command – Redstone Arsenal awards Lockheed Martin a $61 million cost-plus-incentive-fee contract to develop and demonstrate the Missile Segment Enhancement Containerized Launcher and RIG-360 Integrated Assembly, including three flight test articles.